1 / 6

Information from MSFD CIS Process Ulrich Claussen Co- lead WG GES

Information from MSFD CIS Process Ulrich Claussen Co- lead WG GES. MSFD – Update on CIS Process. The MSFD CIS process is organised as follows MD agree on WG work programmes & determine direction of work MSCG works on strategic overarching issues of the MSFD.

marygriffin
Download Presentation

Information from MSFD CIS Process Ulrich Claussen Co- lead WG GES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information from MSFD CIS ProcessUlrich ClaussenCo-lead WG GES

  2. MSFD – Update on CIS Process • The MSFD CIS process is organised as follows • MD agree on WG work programmes & determine direction of work • MSCG works on strategic overarching issues of the MSFD. • Underneath MSCG, the following WGs operate • WG GES on Good Environmental Status working on • Assessment of the marine environment • Definition of GES and • Establishment of Environmental Targets • Monitoring • Programmes of Measures • WG DIKE on data management and reporting • WG ESA on socio economic aspects • Under WG GES two technical subgroups are established: • TSG Noise • TSG Marine Litter ECOSTAT-Meeting, 24.04.2013 Ispra 43. Essener Tagung für Wasser- und Abwasserwirtschaft

  3. MSFD – Deliverables • Until 2013 the following products have been delivered • Development of CU on Articles 8 (IA), 9 (GES) & 10 (ET) • MS reports on Initial Assessment, GES and Environmental Targets • Lessons learnt • TSGs worked sufficient on problem characterisation and proposals on monitoring • Role of RSCs still unclear. Tool to achieve coherence • Lack of progress on D3 on commercial fish stocks (ICES) • Current work of the COM • Article 12 assessment on coherence of MSFD implementation • Lack of coherence in MS approaches • Issues related to scales and aggregation (no WB, many QEs) • Differences between coastal and marine waters ECOSTAT-Meeting, 24.04.2013 Ispra 43. Essener Tagung für Wasser- und Abwasserwirtschaft

  4. MSFD – CU & Monitoring • COM identified that MS have applied the MSFD in different ways. Therefore, the following work is proposed • Further development of CU on Articles 8, 9 & 10 • Develop guidance on assessment scales and aggregation rules • WS in 2013 • Consider need to distinguish between status and pressure QEs • Draft concept paper on MSFD monitoring is available. COM proposal to follow WFD philosophy on monitoring types was not endorsed. The draft contains inter alia • Seven recommendations/key messages • Draft outline for a JRC guidance document on MSFD monitoring aiming at a final product end of 2013. • For the elaboration of the guidance document, a steering group was established, which met first 22.04.2013. A timeline was set up. ECOSTAT-Meeting, 24.04.2013 Ispra 43. Essener Tagung für Wasser- und Abwasserwirtschaft

  5. MSFD – Measures & Information Exchange • Work on Programmes of Measures is also on the agenda. In 2015 POM should by developed by MS aiming at implementation in 2016. • The COM presented its plan for the preparation of an ESA/GES WS: • Benefits of GES have to be calculated. COM expects an analysis whether proxies can be used when not all data is available • DIKE planning of reporting of POM has started • Information exchange continues e.g. by • Presentation of thematic JRC WS on eutrophication, contaminants and biodiversity • ICES WSs on fisheries (April 2012 & 2013) • Marine Litter Conference from 10 – 12 April 2013 in Berlin • COM informed that ECOSTAT might be approached to do some work related to certain descriptors. ECOSTAT-Meeting, 24.04.2013 Ispra 43. Essener Tagung für Wasser- und Abwasserwirtschaft

  6. Thank you for your attention! ECOSTAT-Meeting, 24.04.2013 Ispra 43. Essener Tagung für Wasser- und Abwasserwirtschaft

More Related