1 / 15

Driving through whole Europe ? - Homologation: Problems and Solutions

Driving through whole Europe ? - Homologation: Problems and Solutions. AEbt Applied Railway Technology Mr. Volker Drenkhahn CMO. Europe Rail networks. Do you remember?. 100 years ago Paris - Istanbul. Yesterday Gara de Nord. 2016 Sirkeci Istanbu l.

marypearson
Download Presentation

Driving through whole Europe ? - Homologation: Problems and Solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Driving through whole Europe ? - Homologation: Problems and Solutions AEbt Applied Railway Technology Mr. Volker Drenkhahn CMO

  2. Europe Rail networks

  3. Do you remember? 100 years ago Paris - Istanbul Yesterday Gara de Nord 2016 Sirkeci Istanbul

  4. Try today to ride from Constanta to Rotterdam

  5. Easy to ride from Constanta to Rotterdam ?

  6. Easy to ride from Constanta to Rotterdam ? you have to cross six countries: Romania Hungary Slovakia Austria Germany Netherlands Easy to ride from Constanta to Rotterdam ?

  7. Possible problems: different train operators different languages and traffic regulations different Train Control Systems different interlocking in railway signaling Uniform European Rail?

  8. The European Solution (theoretical) THE EUROPEAN RAIL TRAFFIC MANAGEMENT SYSTEM • Interoperability • Speed • Performance • Global standard • Cross border ETCS European Train Control System GSM-R Global System for Mobile Communications – Rail(way) ETML European Train Management Layer Solution or more problems? What’s about the practical side?

  9. What’s about the practical side? to refurbish Needs of operators to implement ETCS systems on rolling stock

  10. What’s about the practical side? Needs of operators to implement ETCS systems on rolling stock Supplier of ETCS components Training and know-how Maintenance with ETCS experience Homologation for different EU countries Refurbishment NoBo + DeBo DeBo + AsBo Integrator of ETCS Access to different european rail networks

  11. Our services throughout all project phases: • Specification of all necessary electrical, pneumatic and mechanical alterations • Onboard arranging and providing the interface to the ETCS on-board and trackside equipment • Cooperation with leading ETCS-system suppliers for ETCS on-board equipment • Planning, implementation and monitoring of the reconstruction / modernization • Planning and implementation of commissioning DeBo + AsBo

  12. Our services throughout all project phases: • Vehicle and track tests • Approval processing and delivery of evidence needed, especially the homologation • Full project management and cooperation with regulatory authorities, experts and appraisers • Manage the implementation between NoBo, DeBo and AsBo • Service to get necessary national homologations and rail networks DeBo + AsBo

  13. For further informationplease contact us Quality management in accordance with EN ISO 9001 Thank you for your attention Accredited testing laboratory according to DIN EN ISO/IEC 17025 Accredited inspection body according to DIN EN ISO/IEC 17020

  14. Different languages and trafficregulations Source: UIC

  15. Different interlocking in railway signaling Today: Tomorrow: Source: Meyer zu Hörstle, DLR

More Related