TFN/OARnet update

TFN/OARnet update. OARtech December 14, 2005 Paul Schopis pschopis@oar.net. Spam Filtering Project. State-wide committee Survey to OARtech and OSTEER Subgroup to look at solutions hosted off-site appliance-based software-based Meeting with vendors this Friday 12/16/05. Last Mile Update.

masato
Download Presentation

TFN/OARnet update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TFN/OARnet update • OARtech December 14, 2005 • Paul Schopis • pschopis@oar.net

  2. Spam Filtering Project • State-wide committee • Survey to OARtech and OSTEER • Subgroup to look at solutions • hosted off-site • appliance-based • software-based • Meeting with vendors this Friday 12/16/05

  3. Last Mile Update • All schools are connected to the backbone • 17 of 17 Phase 2 institutions are directly connected with fiber-based connections • Added since last meeting • Central State • U of Dayton • Neoucom • Kent ( Not rolled traffic yet)

  4. Last Mile Update • 10 Phase 3 institutions directly connected • Kenyon • Mount Union • MVNU • Cedarville • Marietta • Otterbein • Wilberforce • Wittenberg • Denison • Terra State

  5. Last Mile Solutions • Dark fiber to the PoP • Spectrum Network Solutions • Local Area Rings (e.g., CERF) • Leased circuit to PoP • SBC Last Mile Agreement • Time Warner Cable Agreement completed • SOMACS for T1s and DS3s • RFQ for DS3 and above in conjunction with State of Ohio ????

  6. Upgrades • Ring 0 Upgraded • Joint project with eTech and OSC-Springfield • Ring 2 complete • Ring 3-0 carries OSC-Springfield 10 GigE

  7. Springfield POP • Turning regen site into POP • Using OADM to provide service • OSC-Springfield and • Cedarville • Wittenberg

  8. Retire Old Backbone • All circuits are retired

  9. Partners • Schoolnet design complete • Deployment is done except where facilities are not ready

  10. Backbone • Power Outage at Neilston • Backup power functioned as designed • Manhole fire at Canton • Melted cable

  11. Resources • statseeker.oar.net • portal.oar.net

  12. Questions?