MD 180 (Jefferson Pike) Community Safety and Enhancement Project

MD 180 (Jefferson Pike) Community Safety and Enhancement Project. Public Meeting December 11, 2013. Huqin (Aimee) Zhang Email: hzhang@sha.state.md.us Phone: Toll free #: 1-888-228-5003 410-545-8006. Project Goals. Improve drainage Improve pedestrian facilities

matana
Download Presentation

MD 180 (Jefferson Pike) Community Safety and Enhancement Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MD 180 (Jefferson Pike) Community Safety and Enhancement Project Public Meeting December 11, 2013 • Huqin (Aimee) Zhang • Email: hzhang@sha.state.md.us • Phone: Toll free #: 1-888-228-5003 • 410-545-8006

  2. Project Goals • Improve drainage • Improve pedestrian facilities • Improve roadway condition

  3. Project Phasing Phase 1 – Concept Development Phase 2 – Preliminary Engineering Phase 3 – Construction

  4. What happened in the past? • Concept was finalized in 2009 • Bike compatibility waiver was approved. • Over 2/3 of property owners voted to proceed with select on-street parking reduction in order for drainage improvements to be implemented

  5. What are the needs now? • To bring the project compliant with current environmental regulations New Storm Water Management (SWM) regulations were implemented in 2010 Different SWM practices (bioswales, micro bioretention, wet swale etc) need to be investigated and used where practical • To provide ADA compliant sidewalks 5 foot sidewalks need to be provided from back of curb to back of sidewalk with no obstacles. The 2009 concept has utility poles, traffic signs, mailboxes, etc within the proposed sidewalk.

  6. SWM Facilities Examples Wet swale Pond

  7. ADA Compliance

  8. 3723 Jefferson Pike

  9. 3723 Jefferson Pike

  10. 3723 Jefferson Pike

  11. 3817 Jefferson Pike

  12. 3817 Jefferson Pike

  13. 3817 Jefferson Pike

  14. 3817 Jefferson Pike

  15. 3817 Jefferson Pike

  16. What to expect next? • Surveys crew already started the work • Field Engineers • Refine the concept to comply with the new regulation • Re-establish community task force • Next task force meeting in 2-3 month • Schedule a. Survey completion 4/25/14 b. PI (30% design) milestone meeting 6 month after survey completion.

  17. Questions / Comments? Contact: Huqin (Aimee) Zhanghzhang@sha.state.md.us Toll free #: 1-888-228-5003 Or 410-545-8006 As part of the Title VI  of the Civil Rights Act 1964 program and as a recipient of federal funds, SHA strives to include all groups relevant to its projects in the project planning and design processes. If you didn’t get a chance to fill out our ‘Voluntary Information Survey’ and would like to participate, please take a moment to complete it on your way out.