100 likes | 347 Views
Printing Process. print. i nspection. t ransport. Process S teps. stencil cleaning. alignment. Printing Process. Print direction. Frame. S tencil. Solderpaste. Squeegee. M esh. P ad. PCB. Printing Process. O.K. Bridge. O.K. Cleaning necessary. Requirements for a good print.
E N D
print inspection transport ProcessSteps stencilcleaning alignment
PrintingProcess Print direction Frame Stencil Solderpaste Squeegee Mesh Pad PCB
O.K. Bridge O.K. Cleaning necessary Requirementsfor a goodprint • Clear definitionofprinteddeposits • Sharp edges • Flat surface • Print height = Stencil thickness • Precisealignment • NoFluxbleed out
I P T C I: Inspection T: Transport C: Cleaning P: Print Time Saving Time saving: T faster -13% Time saving: T faster -13% C & I -13% Time saving: T faster -13% C & I -13% I & P - 29% &P 1 total cycle = 100% • Reduceprocess time upto 29 %
Parallel Processing: Tripple Rail Transport (TRT) • Speed optimisedusing Tripple Rail Transport