1 / 12

Gun3 2004 summer shutdown New NEG’s - Ten 9.5” strips New NEG tube – 27 hr. sputtering time

Preliminary SVT4722#2-GUN3 Status (1/12/05). Gun3 2004 summer shutdown New NEG’s - Ten 9.5” strips New NEG tube – 27 hr. sputtering time New cathode – “yellow” 25 deg SS polished to 1um, <2pA @ 100kV New cesiator strips Sacrificial bulk w/ large Ta cup Bakeout good – no leaks

mateja
Download Presentation

Gun3 2004 summer shutdown New NEG’s - Ten 9.5” strips New NEG tube – 27 hr. sputtering time

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preliminary SVT4722#2-GUN3 Status (1/12/05) • Gun3 2004 summer shutdown • New NEG’s - Ten 9.5” strips • New NEG tube – 27 hr. sputtering time • New cathode – “yellow” 25 deg SS polished to 1um, <2pA @ 100kV • New cesiator strips • Sacrificial bulk w/ large Ta cup • Bakeout good – no leaks • Bulk activation 4% at 670 nm w/ UHV ~ 5nA baseline (ELOG1228461) • HiPot stalk out 120kV OK vac burst 110kV & stalk in 110kV OK – cathode OK • SVT4722#2 loaded • No hydrogen cleaning • In solder – no heat in air • 5 mm polished Ta cup • Stalk#4 • Loaded into Gun3 on 8/11/04 • Bakeout good – no leaks • Cathode heat 1 hr @ 630 C • Activation OK - 5% at 655 nm and 0.65% at 769 nm

  2. Hall A 776 nm • Gun3 SVT4722#2 • Heat • 45 min up • 15 min @ 630 • Cool • Reactivate • ~15 yo-yo’s • Vacuum < 20 nA • Hi-Pot • Stalk Out - OK • Stalk In - OK • Typ. 60 mA leakage Hall B 655 nm Hall C 782 nm

  3. Notably good injector setup… • Measured beam polarization, surface charge limit, analyzing power • Calibrated HVPS against Pcup • Early demonstration of possible “Qweak”-type beam

  4. ELOG#1202899 SVT4722#3VGUN (Reblochon)

  5. Calibrate laser power vs. attenuator over relevant range… • Measure photocurrent • vs. laser power twos ways… • 200 mA ramp • 100 mA + 100 mA ramp

  6. QE vs. laser power at 776 and 782 nm • one makes sense, the other less so…

  7. Analyzing power is low, but not zero… • A ~ 2.1% B ~ 0.2% C ~ 2.2%

  8. Physics started Saturday, but poor transmission…

  9. Sunday, on-call • Corrected orbit at 1I03/1I04 – transmission fully restored (good) • Hall B1 picomotor to reach 30 nA – too far (spot move!) No more orbit shifts. Good transmission.

  10. Hall A 776 nm Hall B 655 nm Hall C 782 nm

  11. QE vs. Time (yet), because… • Daily charge plot app not working – Bickley will fix… • StripTool “archiver feature” does not dump data… • Archiver for gun current is running at 5 Hz (eek!) – too much data, too late… New “starting line” Hall B “spot move”

  12. Efficiency numbers…

More Related