1 / 61

International Trade and Business Processes Group

International Trade and Business Processes Group. Chair: Jean-Luc Champion Vice Chair: Pat Toufar. Welcome to the 12 th UN/CEFACT Forum in Mexico 7-11 April 2008. TBG Working Groups. Cross Domain Buy – Ship – Pay Independent Domain. TBG Working Groups. Only 4 minutes !!. Cross Domains.

mateja
Download Presentation

International Trade and Business Processes Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Trade and Business Processes Group Chair: Jean-Luc Champion Vice Chair: Pat Toufar Welcome to the 12th UN/CEFACT Forum in Mexico7-11 April 2008 12th UN/CEFACT FORUM - Mexico

  2. 12th UN/CEFACT FORUM - Mexico

  3. TBG Working Groups • Cross Domain • Buy – Ship – Pay • Independent Domain 12th UN/CEFACT FORUM - Mexico

  4. TBG Working Groups Only 4 minutes !! 12th UN/CEFACT FORUM - Mexico

  5. Cross Domains • Working Groups within Cross Domains • TGB17 - Harmonization • TBG14 - Business Process Analysis • TBG16 - Entry point and Website 12th UN/CEFACT FORUM - Mexico

  6. TBG17 Harmonization Mary Kay Blantz, Chair Marion Royal, Vice Chair Hisanao Sugamata, Vice Chair Delta Pelgrim, Secretariat Sue Probert, Lead Editor Andreas Schultz, QA Lead

  7. TBG17 • Approved Submission Guidelines & Procedures • Approved single spreadsheet • For submissions and publication • Approved TBG12 Accounting Entry submission • For CCL 08B • CCL 08A in Audit (ICG) 12th UN/CEFACT FORUM - Mexico

  8. TBG17 - Next F2F Meetings Interim Meetings • 19 – 23 May: Seoul • 11 - 15 August: Copenhagen • 22 – 26 September: Geneva 12th UN/CEFACT FORUM - Mexico

  9. TBG 14 Business Process Analysis Mexico Forum April 2008 Chair- Ian Watt Vice Chair- Niki Sahling 12th UN/CEFACT FORUM - Mexico

  10. TBG 14 Accomplishments Mexico • MRI Sunday • 14 Key People • Refer Report & Attached Presentations • Framework building CBP -> ODP5 • Feedback sought • Doc with TBG steering • Partnering – TBG17 & TBG14 • Lunch and Learn • Standing Room only ~40 Participants • Presentation on TGB14 homepage • BuyShipPay model • Released to TBG • TBG14 moved from R&D to Operational 12th UN/CEFACT FORUM - Mexico

  11. TBG16 Entry Point & Web Site Chair : Alain Dechamps

  12. TBG16 Entry point • New TBG users (TBG1 & TBG17) • Will submit shortly to TBG steering a first draft of the Change Request procedure on XML « documents » • Most of the UN/EDIFACT DMRs were approved/ mended in accordance with the submitters.Only two TBG 4 DMRs were postponed (no representives of Customs) 12th UN/CEFACT FORUM - Mexico

  13. Buy – Ship - Pay • TBG01-Supply Chain • TBG02-UNeDocs and Digital Paper • TBG03-Transportation • TBG04-Customs • TBG05-Finance • TBG08-Insurance • TBG15-International Trade Procedures • TBG18-Agriculture • TBG19-eGovernment 12th UN/CEFACT FORUM - Mexico

  14. TBG1 Supply Chain Chair: Coen Janssen Vice chairs: Mounir El-Khoury, Dr. Kim Yong Jae Secretary: Gilles Brandel

  15. Stakeholders / supporters of TBG1 work Stakeholders / active contributors to the TBG1 work: • Swedish public sector (local authorities and county counsils) • Danish public sector • EDIFrance • CEN/EEG1 workshop • CEN/BII workshop • BoostAero • GS1 • Odette • AIAG • JAI • OASIS/UBL • Rosettanet • US Government • LMI / Defense Logistics Agency • Korea Polytechnic University 12th UN/CEFACT FORUM - Mexico

  16. Project status PROJECT LEAD STATUS READY(*) CCL • eCatalogue Karina Duvinger BRS Jun 08 09A • Scheduling Samy Scemama BRS+RSM May 08 08B • Ordering Martin Forsberg BRS+RSM May 08 08B • Despatch / Rec. Jörg Walther BRS+RSM May 08 08B • Invoice Klaus Förderer BRS+RSM May 08 08B • Simple Invoice Gilles Brandel BRS+RSM Jun 08 08B • Remittance Advice Mounir El-Khoury BRS+RSM May 08 08B • eMarket research Helge Simonsen BRS ready 09A • Material Safety Data Delta Pelgrim Schemas Almost 08A available • Quotation Gilles Brandel Proposal in progress Jun 08 09A • Trade Data for Customs Edmund Gray Proposal in progress Jun 08 09A • Order Status Report Thomas Lyons BRS+RSM Dec 08 09A RSM / CCL EDITING TEAM Pat Toufar, Coen Janssen, Martin Forsberg, Gilles Brandel, Thomas Lyons • 08A Submission finalised • 08B submission May 08 12th UN/CEFACT FORUM - Mexico

  17. Meeting highlights • Deadline for 08B submission agreed with TBG17: End of May 2008 • Contributed to standards maintenance proposal submitted to TBG Steering • Joint use case submission to TMG regarding UCM from TBG1, TBG2, TBG6 • Harmonisation with US Government submission • Ordering, Forecasting, Inventory Adjustment, Order Status Report • Joint meetings with TBG5, 6 regarding Invoice requirements 12th UN/CEFACT FORUM - Mexico

  18. TBG 2 Digital Paper Chair: Michael Dill Vice-Chairs: Sue Bravery, Conor O’Riordan, Eva Chan

  19. Forum Results - UNeDocs TBG1 + TBG3 – Agreed to a joint group on methodology alignment with a link to TMG TBG3 –Agree to BIM’s concept & forward plan TBG6– Worked on Standards Maintenance Project TBG15 – TBG2 contributing to the development of UNECE Rec 34 Trade Facilitation Seminar presentation 12th UN/CEFACT FORUM - Mexico

  20. TBG3 Transport Chair : Dominique Vankemmel (France) Vice-Chairs : Yoshi Kito(Japan), Simon Spoormaker (Nederland) Secretary : Henk Van Maaren (Nederland) Liaisons : ISO/TCs 104,154,204 & 8, ANSI X12I, WCO

  21. Achievements 7-11 April 2008 TBG3 Transport • Press release for the 20th anniversary of the Transport group (launch April 1988 in Washington) • BRS IFTM for International Forwarding & Transport endorsed and released by TBG 3 for review through the UN/CEFACT procedure • Core Components Transport joint submission TBG2/3 harmonized by TBG17 ready for publishing in CCL O8.A • Define approach to develop transport subsets from SHIP BIM (UNeDocs) and joint work with TBG2 to define BIM methodology • Established next BRS development priority: Transport Instructions, Status Reporting • Prepare the next release V3 of the ITIGG worldwide implementation guidelines for EDIFACT and XML (General recommendations, Principles and Rules, business processes and message sets) 12th UN/CEFACT FORUM - Mexico

  22. Achievements 7-11 April 2008 TBG3 Transport • Endorsed detailed TBG3 Work Plan for the year 2008 • Planned 2 additional TBG3/ITIGG Interim meetings: 7- 11 July in Brussels and 6-10 October in Paris (total 4 full week meetings in 2008) and conference calls • Joint meetings with other groups: TBG1 (joint project “Logistics Services”), TBG2 ( UneDocs and BIMs), TBG6 (Security project),TBG14 (UMM Supply Chain Model harmonisation), TBG18 (Fish tracking/tracing) • GS1: initiated joint work to harmonize their BRAD Business model with the TBG3 BRS Forwarding/Transport within the LIM initiative (Logistics Interoperability Model - eCOM Standards Working Group) • Information on the latest ISO standards developments (TC104, TC204 and TC8) • Presentation of current implementations and projects: GS1, Australia BAHS, France GESFIM, ShortseaXML, TOPAS…. 12th UN/CEFACT FORUM - Mexico

  23. TBG8 - Insurance Chair: Andreas Schultz (DKV) Vice-Chair: Beth Grossman (ACORD) Secretary: Jan Vrijenhoek (SIVI) Liaison(s) : ACORD, CSIO, TBG8 Europe/eEG7

  24. TBG8 - Insurance Worked on general issues: • Organisation • Country reports • Lunch & learn sessions We had discussions with: • SWIFT • HR-XML • Automotive Industry • TBG17 12th UN/CEFACT FORUM - Mexico

  25. TBG8 - Insurance Worked on P6 project: Insurance Core Components Library • Maintenance issues • Observation CCTS 3.0 • Submissions of changes/new CC’s • Tools • Publication • Workplan • Finalize submission III by June, Norwich meeting • Finalize submission IV by August, Hamburg meeting • Start Motor Claims data by end of 2008, New York meeting 12th UN/CEFACT FORUM - Mexico

  26. TBG8 - Insurance best regards 12th UN/CEFACT FORUM - Mexico

  27. TBG 15 – International Trade Procedures Gordon Cragge – Chair Jari Salo – Vice Chair

  28. TBG 15 International Trade Procedures TBG 15 at 12th UN CEFACT Forum – Mexico Trade Facilitation Implementation Guide • Very successful Face to Face meeting with Contractor • Approved Project Implementation Plan and outline of Guide • Agreed Project communication and reporting procedures • Confirmed the participation and role of the Institutional and Country Reference Groups • NOW THE WORK CAN BEGIN ON PRODUCING THE GUIDE 12th UN/CEFACT FORUM - Mexico

  29. TBG 15 International Trade Procedures TBG 15 at 12th UN CEFACT Forum – Mexico Supply Chain Project – scoping requirements with TBG14 • Recommendation 6 • Move to ODP 5 – Public review • Recommendation 35 • Move to ODP 4 – Forum review • Recommendation 11 • Move to ODP 7 – Publication • Recommendation 34 • Move to ODP 4 – Forum review • Single Transport Contract Code • Project needs stakeholder clarification 12th UN/CEFACT FORUM - Mexico

  30. Hasta la vista, baby TBG 15 International Trade Procedures Thank you Mexico and … BUT… 12th UN/CEFACT FORUM - Mexico

  31. So see you in Senegal I’ll be back TBG 15 International Trade Procedures 12th UN/CEFACT FORUM - Mexico

  32. TBG18 Agriculture Chair : Bruno PREPIN Vice-Chair : Frans VAN DIEPEN

  33. Done this week • 5 project proposals submission validated by TBG 18 • Livestock Life Record Project • Electronic Data Exchange Proxy • Electronic Data Interchange of laboratory analysis in agriculture and in the field of agri-food • Tracking and Tracing Fish • Cattle registration and movement data exchange and animal passport • Joint Project Proposal with TBG 12 • P075 - Accounting Reporting – Joint Project Amendment 12th UN/CEFACT FORUM - Mexico

  34. Done this week • Ecert : RSM has been submitted to ICG. • eDAPLOS : RSM has been submitted to ICG. • Demonstration of Ecert • Report of CEN EEG14/TBG18 in cattle data harmonization and spatial information in agriculture. • Development of BRS for all the 5 new projects • Preparation of a portfolio of TBG 18 work: • Develop a long- term strategic vision for the TBG 18 • Summary of all projects already done and under development 12th UN/CEFACT FORUM - Mexico

  35. Next Meetings • CEN EEG14/TBG18 Meeting 12-15 May, Prague, Czech • TBG 18 - F2F Meeting in September, Lyon France • Ecert Phyto Implementation Meeting, November, Ottawa, Canada 12th UN/CEFACT FORUM - Mexico

  36. TBG 19 eGovernment Chair: J-P Henninot Vice-chair: David Dowling Secretary: Sylvie Colas

  37. TBG 19 activities • Projects • eArchiving status • Draft BRS under internal review (confirmed in June) • Joint project ePP (Public Procurement) • Steering Committee held • Call for participation to be sent by Secretariat on next Monday • And inclusion in the Forum press release • Main first task • Collecting existing deliverables from different sources • Mapping them and and identify gaps towards « Public » needs • Roadmap, method and timing updated and adopted 12th UN/CEFACT FORUM - Mexico

  38. TBG 19 activities • Other items • Follow up of ad-hoc team reflexion regarding eGov modelling activities • Initiated in Stockholm • Conclusion of the team: « seek guidance from Bureau » • Is CEFACT the right venue for « higher level » topics (GSRM-Like)? • If something is to be addressed, how and with whom? • This action initiated between team convenor and the Chair of CEFACT • Common concerns • UBL convergence and eBII activities • Involvment in contacts/discussions under CEFACT chair initiative • Harmonisation and interoperability • Consistent use of CCs between TBGs • A case with « Party » and « organisation » • Is being addressed by involved actors • But also needs a broader view • Agreed with TG1-TBG6 to make a note to TBG 17 12th UN/CEFACT FORUM - Mexico

  39. Independent Domains • TBG06-Architecture, Engineering and Construction • TBG09-Travel, Tourism and Leisure • TBG10-Healthcare • TBG12-Accounting and Audit • TBG13-Environmental 12th UN/CEFACT FORUM - Mexico

  40. TBG6Architecture – Engineering - Construction Chair: Bernard Longhi Vice-Chair: Jun-Ichi Yamashita Vice-Chair: Chris Hassler

  41. TBG6 (AEC Gp)Architecture – Engineering - Construction • 5 TBG6/TBG1 PROJECTS ON GOING • eCatalog Project, hosted by TBG1 • eTendering Project (Public and private Procurement) • Project Schedule and Cost Performance Management • Contract Financial Execution Management • Security for documents and messages, hosted by TBG6, but intersectorial project for all TBGs • TBG6 attendees in Mexico: • 10 participants coming from France, India, Japan, United States… 12th UN/CEFACT FORUM - Mexico

  42. Life cycle of public procurement Procurement / Strategy Design / Estimation Contract Project Management Maintenance Tendering Not Yet! eTendering CFEM PSCPM Not Yet! • Design and Estimation  ・・・ Not Yet. • Tendering          ・・・ e-Tendering ebXML Standards for BoQs/Princing doc exchanges • Contract and Finance ・・・ Contract Financial Execution Management: • Initial Contract documents and Invoices • Project Mgt ・・・ Project Schedule and Cost Performance Management Project: not yet • Maintenance ・・・ Not Yet. 12th UN/CEFACT FORUM - Mexico

  43. TBG6 Standards Progress eTendering PSCPM CFEM Security Full UN/Cefact Standard (D07A): Monday 17 March 2008 Candidate Release SCHEMAS RSM BRS 12th UN/CEFACT FORUM - Mexico

  44. TBG1-TBG6 joint projects Public and private Procurements projects For a global set of ebXML standards to meet user requirements Supply chain – Trade messages – TBG1 Quotation Payment Process Catalogues Scheduling Invoicing Ordering Delivering eTendering Contract and Project Management – TBG6 Security Project Schedule and Cost Performance Management Contract Financial Execution Management 12th UN/CEFACT FORUM - Mexico

  45. TBG6 (AEC Gp)Architecture – Engineering - Construction eTendering Project (Public and private Procurement) and Project Schedule and Cost Performance Management • entering maintenance phase • 2 “bundles” have been prepared for the 2 standards (BRS, RSM, XML Schemas, Code Lists) and will be posted on TBG6 Web • e-Flyers being drafted to “explain and promote” the standards • TBG6 Collaborative Web Site launched…in a few weeks 12th UN/CEFACT FORUM - Mexico

  46. TBG6 (AEC Gp)Architecture – Engineering - Construction • Requirements Model produced through the recent working group will be made available as a futher version of the working document on the TBG6 website. • Other stakeholder’s groups have been invited to contribute, such as TBG 5 for payment process and TBG 19 for specific public issues. Invitations were open until mid June 2007……?! • Contact will be maintained with TBG 14 and MRI to ensure compliance with the UMM and to assist the improvement of the production process. Contract Financial Execution Management 12th UN/CEFACT FORUM - Mexico

  47. TBG6 (AEC Gp)Architecture – Engineering - Construction Security for documents and messages • Use cases will be produced to start efficient production of the updated BRS: • Bid submission (Sujeet Bhatt / TBG6) • Invoice (Klaus and Richard / TBG1) • Contract notification (DCMA), with confidentiality management • A use case from Transportation group / TBG3 ? • Finalise relevant standards identification and analysis • Enrich draft BRS with • New functional analysis framework • Additional use cases (for 1st week of June 2008) • Structure deliverables • Practice recommandations • Existing standards maintenance • New standard development • Project leader is Sujeet Bhatt (India) and project editor Peter Borresen (DK) 12th UN/CEFACT FORUM - Mexico

  48. TBG6 (AEC Gp)Architecture – Engineering - Construction Coordination and cross participations results • UN/CEFACT Standards Maintenance Project: new CR Form and log system (unique Entry point / TBG16) + unified maintenance process to allocate TBG responsibility and update existing standards • Steering Committee for Joint project on ePP (TBG 1, 6 and 19): decision to contribute with TBG6 Public Procurement cycle • Joint Meeting with TBG1: new Binary File ABIE (D08B), Multiple language Text.., Party and Organisation, UCM Use Cases  implementation rules 12th UN/CEFACT FORUM - Mexico

  49. TBG9 – Travel, Tourism and Leisure Chair: Paula Heilig Vice-Chair: Akio Suzuki

  50. TBG9 – Travel, Tourism and Leisure • Regional reports • Reports on other travel industry standards groups • Maintenance items • Review of new core components for next phase of small scaled lodging • Review of new project proposals • Administrative items 12th UN/CEFACT FORUM - Mexico

More Related