External Interfaces & Integration Oct 23 2007 Stephen Kerr. Sandbox deployment. Following services are available Get mRID System Status Market Transaction Services Three Part Offer Incremental/Decremental Offers Current Operating Plan Output Schedule Bid Set Acceptance Bid Set Errors
E N D
Sandbox deployment • Following services are available • Get mRID • System Status • Market Transaction Services • Three Part Offer • Incremental/Decremental Offers • Current Operating Plan • Output Schedule • Bid Set Acceptance • Bid Set Errors • Self Arranged Ancillary Services • Ancillary Services Offer • Ancillary Services Trade • DAM Energy Bid • DAM Energy Only Offer • Congestion Revenue Rights Offer • PTP Obligation Bid • Self Schedule • Capacity Trade • Energy Trade • DC Tie Schedule • Market Information Services • Proxy Curves*** • Startup and Shutdown Instructions • Total Regulation • Load Ratio Share • Unit Availability • Forecasted Load • Real-Time System Load • Market LMPs and SPPs • Mitigated Curves*** • Notifications • Notices and Alerts *** These will be withdrawn as the information cannot be retrieved from MMS easily • Following services are in the pipeline • Alert Acknowledgement • Market Transaction Services • Outage Cancel/Create/Query • Get AwardSet • Notifications • Outage Notifications • Notices and Alerts • CRR Awards • Energy Offer Awards • PTP Obligation Awards • Pending Trade • Energy Only Offer Award • Energy Bid Award • AS Award • A major update to the Sandbox has added the following services: • Market Information Services • ASSystemPlan • AggregatedASOfferCurves • BindingConstraints • CompetitiveConstraints • DeratedCRRs • DynamicRatings • LoadDistributionFactors • MCPCs • ASObligations • Forecasted Load • MarketTotals • SCEDViolatedConstraints • ActiveContingenciesinSCED • ShiftFactors • TotalASOffers • TotalEnergy • VoltageProfiles • LoadProfiles 2
External Interface Specification 1.04 • Minor update, no new services • Published Sept 21st • Review feedback requested by October 5th • V1.06 has been posted • Comments & Responses • Some questions about Active Contingencies in SCED • Report the contingencies that have caused constraint violations • OR • Report all contingencies • OR • both • We will remove the Proxy and Mitigated Curve services from the spec and Sandbox 3
EDS deployment • Back-end integration with MMS entered test in early August for EDS and exited at end Sept. Several bug fixes have been made to the following services: • Three Part Offer • Incremental/ Decremental Offers • Current Operating Plan • Output Schedule • Plan to be ready to deploy remaining submissions to EDS around end November • MMS does not support mixed bidsets – but it has been expressed as a must have by MPs • Broker design is in progress • XSDs and WSDL for Sandbox & EDS will be republished with the new Sandbox services • EDS & Sandbox Namespaces will be in sync • Some schema changes in Sandbox to support new services 4
Service status on Sandbox • All services on Sandbox have been connected to, some revisions required to XSDs & WSDLs • New namespace convention – we will break best practice so that the constant renaming does not cause constant rebuild by MPs • 2007-06 with a version number in the XSDs • More calls for services to be available on the private network rather than public • Defects are being posted here: • http://nodal.ercot.com/readiness/sandbox/documents/docs/Sandbox_Defects.xls • New common services released to EDS and Sandbox 5
Design Artifacts • Completed detailed designs • Entity Registration • Web Services & Back-end connectivity for first 4 batches • NMMS – CRR • MMS & CRR to Settlements • MID-MIR -> All • Common Services • Designs in Progress • Common Services for EMS-MMS • FIP & FOP • EMS <-> MMS for LFC testing • CRR <-> CMM • Remaining Settlement interfaces • Outages • Web Services & Back-end connectivity for remaining services • Future Designs • NMMS <-> EMS Common Services • Verifiable Costs -> MMS 6