1 / 18

700 MHz/Broadband Legislative Process 2012 PA APCO Conference Eden Resort, Lancaster, PA March 28, 2012 0900 to 0950

700 MHz/Broadband Legislative Process 2012 PA APCO Conference Eden Resort, Lancaster, PA March 28, 2012 0900 to 0950. Two Aspects of Public Safety 700 MHz. Narrowband – Paired spectrum from 769-775 MHz and 799-805 MHz Guard Band – 1 MHz spectrum from 768 to 769 MHz and 798 to 799 MHz

matia
Download Presentation

700 MHz/Broadband Legislative Process 2012 PA APCO Conference Eden Resort, Lancaster, PA March 28, 2012 0900 to 0950

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 700 MHz/Broadband Legislative Process 2012 PA APCO Conference Eden Resort, Lancaster, PA March 28, 2012 0900 to 0950

  2. Two Aspects of Public Safety 700 MHz • Narrowband – Paired spectrum from 769-775 MHz and 799-805 MHz • Guard Band – 1 MHz spectrum from 768 to 769 MHz and 798 to 799 MHz • Broadband – Public safety 5x5 MHz block of spectrum from 763-768 MHz and 793-798 MHz and 5x5 block of D block spectrum from 758-763 MHz and 788-793 MHz.

  3. Public Safety 700 MHz Narrowband Spectrum • Spectrum is allocated on a per-region basis through CAPRAD (Computer Assisted Pre-Coordination Resource and Database System) • Pennsylvania consists of 2 regions: Region 36 (Chairperson – Randall Brozenick) & Region 28 (Chairperson – Mark Grubb) • 700 MHz narrowband spectrum faces a 6.25 MHz or equivalent efficiency narrowbanding mandate deadline of January 1, 2017 • Recent Congressional bill does NOT require public safety to give back this narrowband spectrum in exchange for the D block

  4. D Block Spectrum • 5x5 MHz block of spectrum from 758-763 MHz (Downlink) and 788-793 MHz (Uplink) • The FCC attempted to auction the D block along with the other blocks of 700 MHz spectrum when they came available after the digital TV transition. The D block did not meet its reserve price in that auction and, therefore, remained under control of the FCC. • On February 22, 2012, President Obama signed Middle Class Tax Relief Act which included Reallocation of D Block to public safety for establishing the nationwide public safety broadband network.

  5. Public Safety 700 MHz Broadband Spectrum • 5x5 MHz block of spectrum from 763-768 MHz (Downlink) and 793-798 MHz (Uplink) • FCC has designated LTE to be the common air interface for the nationwide Public Safety Broadband Network (PSBN) • Prior to the D block bill, the waiver recipients were required to enter into a lease agreement with the PSST who was selected by the FCC as the Public Safety Broadband Licensee (PBSL). This lease agreement set forth the guidelines for an agency to build out its portion of the nationwide network. • The D block bill establishes the First Responder Network Authority as the new single license holder of the D block and existing public safety spectrum.

  6. First Responder Network Authority • According to the D block bill, The First Responder Network Authority (FirstNet), established within the NTIA, shall ensure the establishment of a nationwide, interoperable public safety broadband network. • FirstNetBoard shall consist of: • Secretary of Homeland Security • Attorney General of Unites States • Director of Office of Management and Budget • 12 individuals to be appointed by the Secretary of Commerce not later than 180 days after enactment. • The appointments shall have: • Not fewer than 3 individuals to represent collective interests of States, locals, tribes, and territories • Not fewer than 3 individuals who have served as public safety professionals • The appointments shall: • Seek to ensure geographical and regional representation • Seek to ensure rural and urban representation • The FCC also established the ‘‘Technical Advisory Board for First Responder Interoperability’’ charged with developing the technical requirements for interoperability of the nationwide public safety broadband network within 90 days of enactment of the Act.

  7. First Responder Network Authority (cont’d) • FirstNetmust complete the RFP process for the construction, operations, maintenance, and improvements of the nationwide PSBN • Upon completion of the RFP process, FirstNet will notify the Governor of each State (or his/her designee) of: • Completion of the RFP process • Details of the proposed plan for buildout of the nationwide, interoperable broadband network in the State • Funding levels for the State as determined by NTIA • No later than 90 days after being notified by FirstNet, each Governor must choose whether his/her State will: • Participate in the deployment of the nationwide PSBN as proposed by FirstNet; or • Conduct its own deployment of a radio access network in the State

  8. State and Local Process • FirstNetmust consult with regional, state, tribal, and local jurisdictions regarding the distribution and expenditures of any amounts required to carry out its responsibilities, including: • Construction or access to the core network and any radio access network build out • Tower locations • Network coverage at the regional, state, tribal, or local levels • Adequacy of security, reliability, and resiliency requirements; • Assignment of priority to local users and selection of entities seeking access to or use of the nationwide interoperable PSBN • Training needs of local users • FirstNetconsultation must occur through the designated single officer or governmental body designated by each state

  9. State and Local Process (cont’d) • NTIA shall establish a grant program to States • Not later than 6 months, and in consultation with FirstNet, NTIA must establish grant program requirements, including: • Defining eligible costs • Determining scope of eligible activities • Prioritizing grants for activities that ensure coverage in rural as well as urban areas • Each State shall certify a single officer or governmental body to serve as coordinator of implementation of grant funds • Also serves as point for FirstNet consultation under §6206

  10. State and Local Process (cont’d) • If a State decides to opt-out, the Governor must notify FirstNet, NTIA, and the FCC • The State then has 180 days to develop and complete RFPs for the construction, maintenance, and operations of the Radio Access Network (RAN) within the State • The State shall submit an alternate plan for the construction, maintenance, and operations of the RAN within the State to the FCC and the plan must demonstrate: • That the State will be in compliance with the minimum technical interoperability requirements • Interoperability with the nationwide public safety broadband network • FCC shall review and either approve or disapprove the plan

  11. State and Local Process (cont’d) • If the FCC approves the plan: • State may apply to NTIA for a grant to construct (not operate and maintain) the RAN within the State • State shall apply to NTIA to lease spectrum capacity from FirstNet • In order to obtain a grant and lease, the State must demonstrate it has: • Technical capability to operate and the funding to support the State radio access network • Ability to maintain ongoing interoperability with the nationwide PSBN • Ability to complete the project within the specified comparable timelines specific to the State • Cost-effectiveness of the State plan • Comparable security, coverage and quality of service to that of the nationwide PSBN

  12. State and Local Process (cont’d) • If the FCC disapproves the plan: • The construction, maintenance, operations, and improvements of the network within the State shall proceed in accordance with the plan proposed by FirstNet • U.S. District Court for the District of Columbia has exclusive jurisdiction to review a decision of the FCC • Additional State Network Items: • If a State chooses to build its own RAN, the State shall pay any user fees associated with the State use of elements of the PSBN • Per section 6302, the federal share of any activity carried out under that section using a grant will be 80 percent of the eligible costs of carrying out that activity • Therefore, there will be a minimum 20 percent matching requirement for both the State and Local planning grants and the State construction grants – It can be waived

  13. Funding – NTIA Borrowing Authority • The Act grants NTIA borrowing authority not to exceed $2B to implement Subtitle B – Governance of Public Safety Spectrum • The Act grants NTIA borrowing authority not to exceed $135M to implement Section 6302 – State and Local Implementation • In each case, NTIA borrows the initial funds from the general fund of the Treasury prior to the deposit of auction proceeds into the Public Safety Trust Fund (PSTF)

  14. Timeline • Feb 22, 2012 – Enactment of Statute • March 23, 2012 – FCC Appoints Technical Advisory Board • May 22, 2012 – Advisory Board Submits Recommendations to The FCC • June 21, 2012 – FCC Approves Recommendations With Revisions • August 20, 2012 – Secretary of Commerce Appoints FirstNet Board • August 22, 2012 – NTIA Establishes Requirements for State and Local Planning Grants • TBD – FirstNet Forms Advisory Committee for Public Safety • TBD – FirstNet Establishes Itself With Resources, Develops RFIs, Consults With Designated Agent for States, Completes RFPs, and Releases Notice • TBD – States Have 90 Days After Receipt of Notice to Opt-IN or OPT-Out

  15. Waivers and Leases • May 12, 2010 – The FCC issued conditional waivers to 21 of the early Waiver Petitioners • States (8) – Alabama, Hawaii, Iowa, Mississippi, New Jersey, New Mexico, New York, Oregon • Counties/Regions (5) - Adams County-Denver Airport (CO), Bay Area (CA), Mesa-TOPAZ (AZ), San Antonio (TX), Wisconsin Counties (WI) • Cities (8) - Boston (MA), Charlotte (NC), Chesapeake (VA), Washington (DC), Los Angeles (CA), New York City (NY), Pembroke Pines (FL), Seattle (WA) • September 9, 2010 – The FCC approved 20 PSST Spectrum Leases for those entities listed above with the exception of Alabama, which was not ready to move forward.

  16. T-Band Giveback • The law states that Public Safety will have to give back the spectrum known as the T-Band (470-512 MHz) • Users of this spectrum must be prepared to vacate it within 9 years and then will have 2 years to move to different spectrum • When this spectrum is auctioned, funding for the relocation will become available from the auction proceeds (estimated to be $1 billion)

  17. What’s Next for Public Safety • Current waiver recipients should still be able to move forward as the public safety broadband spectrum is transferred from the PSST to FirstNet, despite FirstNet not being established until August 2012 • However, early implementers will likely not be authorized on D block spectrum until FirstNet is established, granted the license and leasing terms are agreed upon.

  18. Questions? Ali Shahnami ACD Telecom, LLC 103 Commerce St, Suite 180 Lake Mary, FL 32746 (407) 333–2300 Work (407) 333–2310 Fax ali.shahnami@acdtelecom.com

More Related