An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of instrumentation for 3 MeV and lessons learned U. Raich Linac-4 Beam Coordination Committee 27.6.2013 UliRaich BE/BI

  2. Measurement Line: • Emittance meter • Spectrometer • Transformers • Beam Position Monitors • Bunch Shape Monitor • Halo Monitor • Chopper line: • Wire Scanners The 3 MeV measurement line Uli Raich BE/BI

  3. Transformers • First instrument used to see the 3 MeV beam • Most advanced of all instruments To be improved: • FPGA code in TRIC card to allow independent definition of integration windows for measurement interval and offset calculation • Better shielding against field of neighboring Quadrupoles • Control relative intensity values along the beam line • Finalize watchdog Uli Raich BE/BI

  4. Transformer signal Uli Raich BE/BI

  5. Chopper rise and fall time Uli Raich BE/BI

  6. Emittance Meter The emittance meter consists of a slit at the beginning of the measurement line and a SEMGrid at its end • Emittance measurement now works (more or less) reliably • Re-do position calibration and get values for beam pipe center • Add electronics to read out all 48 wires (currently only 32) • Adapt evaluation program and calculate emittance and Twiss parameters • Check again ADC offset is the same on all channels • Add steering to center the beam on the SEMGrid • Make sure the beam is not too divergent to loose in the transfer line to the SEMGrid Uli Raich BE/BI

  7. Emittance Plot Uli Raich BE/BI

  8. Profile measurement Profile measurements can be done • On SEMGrid without slit • Using projection from emittance plot • Using slit and transformer • Using slit as scraper + transformer Improvements: • Profile measurements using the transformer have been made semi-manually. This method was not envisaged initially. Should be automated. Uli Raich BE/BI

  9. Profile Measurement with scraping Uli Raich BE/BI

  10. Wire Scanners on Chopper line • In general works not too bad • Profile shapes when creating a waste on the WS are not yet understood • We see a second bump. Is it real? Improvements: • Try an L-shaped wire scanner instead of XThis may decrease possible crosstalk • Make sure to have a very small electronics offset Uli Raich BE/BI

  11. Typical wires scanner profiles Uli Raich BE/BI

  12. Wire heating? 250 µs beam pulse 150 µs beam pulse Uli Raich BE/BI

  13. BPMs BPMs are designed to measure • Beam position • Beam intensity • Beam energy by time of flight between 2 BPMs BPMs are least advanced and need more commissioning time • Beam intensity: The signal shape is exactly the same we see on the BCTs but cross calibration is needed to each BPM (different debunching) • Beam position not ok yet. See losses on the electrodes of the 3rd BPMNeed a straight line without magnetic elements between the 3 BPMs to checkWhen using the slit as 4th position the noise in the position measurement increases due to low intensity • TOF measurement starts working but is not stable yet (timing problem?) Uli Raich BE/BI

  14. Spectrometer • The spectrometer was used to determine the buncher phases and amplitudes • Energy spread measurements have not been done yet(for once this not an instrumentation but more an optics problem) • When inserting the slit, the intensity seen on the SEMGrid is very low • Currently uses old electronics with only 40 channels. To be replaced by new electronics reading all 48 channels Uli Raich BE/BI

  15. Bunch Shape Monitor • The monitor has been tested in beam with the Russian INR team • The buncher settings (phase and amplitude) have been verified against the values obtained with the spectrometer • Device works fine and is easy to use • Before the measurement campaign we had a problem with the NI controller card which has been replaced.The original controller module must be re-installed and the LabView software checked. • Integration into the control system to be prepared Uli Raich BE/BI

  16. Bunch shape in bunching and debunching phase Uli Raich BE/BI

  17. Halo Monitor • The device has been used for less than 1 day • Some beam spots have been measured • Precise timing synchronous with the chopper is still missing Uli Raich BE/BI

  18. Halo Monitor results Uli Raich BE/BI