GuoNeng Electricals, China. GNE. Business Sectors. Power Generations – Energy Solutions Project Engineering Machinery Supply Auto Control Solutions Parts & Services Environmental Protections – Total Solutions Thermal power plant by burning urban garbage Ethonol Vinasse treatment. GNE.
E N D
Business Sectors • Power Generations – Energy Solutions • Project Engineering • Machinery Supply • Auto Control Solutions • Parts & Services • Environmental Protections – Total Solutions • Thermal power plant by burning urban garbage • Ethonol Vinasse treatment GNE
Power Generation-Thermal • Steam Boiler • CFB/PC/Bagasse/Biomass • Steam Turbine • Condensing/Extraction/Back Pressure • Turbo Generator • Direct Coupling/Gearbox, Air/Hytrogen Cooling • Total Controls • DCS/PLC, Instrumentations GNE
Power Generation-Hydro • Hydro Turbine • Axial Inflow/Intrusion/Pressure Inflow • Hydro Generator • Single Shaft/Gearbox • Total Controls • DCS/PLC, Instrumentations GNE
Power Generation-Thermal • Business Associated with: • CNIEC, CHEC • GXYA • China Science Group • Hualan Engineering • Top Brands of Manufacturers …… GNE
Sound Track • Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mw,major boiler, turbine, generator plus auxiliaries, 3 sets • Heat and Power Plants for Sugar Mills:bagasse boiler 35-85t/h, turbo generator 3-12mw,major boiler, turbine, generator plus auxiliaries, 5 sets • Heat and Power Plants for Textile, Chemical Mills:CFB/PC boiler 35-120t/h turbo generator 3-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets • Thermal Power Plants of Burning Urban Garbage:CFB boiler 35-65t/h, turbo generator 6-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets • Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d • Auto Controls: DCS, PLC, Instrumentations: 60 sets • Hydro Power Plant:3-10mw: major boiler, turbine, generator plus auxiliaries, 2 sets GNE
Typical Thermal Power Plant • Huaxing Power Plant, Baise, China • Boiler:1*220t/h CFB, 9.81MPa, 540℃ • Turbo Generator: 1*50MW, 9.0MPa, 500℃ • Completion: Dec., 2004 • Notes: Second hand turbo generator, made in 1959 Total Plant Turbo Generator Feed Pumps Control Room DCS Operator Station GNE
Captive Power Plant (1) • Deyongjia Garment Plant, Dongguan, China • Boiler:4×75t/h, CFB, 3.98MPa, 450℃ • Turbine:15MW 3.5MPa 435℃ • DCS:BTG synchronized auto controls • Date of Completion: May, 2001 Total Plant TG Set Coal Conveying Control Room Power Panels GNE
Captive Power Plant (2) • #1、#2、#3、#4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China • Honeywell HC-900 DCS system • All boilers communicate to each other plus remote controls • EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters GNE
Power Plant – Burning Garbage • Dongguan Garbage Power Plant, 2×15+1×12mw, 1200t/d garbage handling, Guangdong, China • Ningbo Garbage Power Plant, 2×15mw, 800t/d garbage handling, Zhejiang, China • Boiler:65t/h CFB, 3.98MPa 450℃ • Turbo Generator:15mw, 3.5MPa, 435℃ • Date of Completion: Dongguan-March, 2005, Ningbo-Dec., 2005 Dongguan Plant Ningbo Plant Turbo Generator Control Room CFB Boiler GNE
International Projects • AA Group, 300t/h, CFB,Biomass, Thailand • Boiler:300t/h, CFB, 9.8MPa, 540℃ • Date of Completion:under construction, to commissioning in Oct. 2008 Signing Ceremony Technical Agreement Signing China Representatives Site Survey Site Survey GNE
International Projects • SSYPL, 2*35t/h, CFB,2*7.5MW STG, India • 2009.04.25 Signing of contract with SSYPL Signing Ceremony GNE
International Projects Lhoknga 2×16MW Power PlantEP Project, Indonesia • Boiler:75t/h,CFBC Boiler, 3.9MPa, 450℃ • Steam turbine and generator:15MW, 3.5MPa, 435℃ • Associated withCHEC, 2006 Used plant package supplied to Indonesia, 2008. • Boiler: 2×75t/h,CFBC Boiler, 3.9MPa, 450℃ • Steam turbine and generator:2×15MW, 3.5MPa, 435℃ HFO DG Sets, 4×10MW, 2008, package supplied to Indonesia • 4×10MW, HFO DG Sets • Associated with GD Imp/Exp Corp. GNE
International Projects India KPPL 2×25MW thermal power plant EP Project • Boiler:2×130t/h, PC Boiler, 3.9MPa, 450℃ • Steam turbine and generator:2×25MW, 3.5MPa, 435℃ Contract Signing GNE
Typical International Projects • SSYPL, Surat, India - Boiler: CFB, 2x35t/h, 3.82MPa, 450 ℃ - TG:2x7.5MW, 3.82MPa, 435 ℃ GNE
Typical DCS installed: XDPS-400, Shanghai Xinhua MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell DCS Applications GNE
Typical PLC installed: S7-200/S7-300, Siemens Schneider Allen Bradley FX2N, Mitsubishi PLC Applications GNE
Installed Instrumentations Pressure Transmitters 50MW Turbo Generator Drum leveler Temprature Probe Speed Sensors Generator Hydrogen Cooling Sony Video Camera Industrial Monitors GNE
Typical Projects #1、#2、#3、#4 Boiler auto controls, Baiganhua, Baise, China • Honeywell HC-900 DCS system • All boilers communicate to each other plus remote controls • EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters GNE
GuoNeng Electricals Ltd. Addr.: Rm1612, Xincheng Int’l Bldg, No.92-1, Nanning, Guangxi, 530028 China Tel: 0771-5511310 5501300 Fax: 0771-5511852 Email: nnguoneng@163.com GNE