MISO Southern Region Integration – ARR/FTR Timeline. FTR WG February 6, 2013. Background. The scope of the transmission system available for use under the MISO tariff will expand to include the MISO Southern region in December 2013
E N D
MISO Southern Region Integration – ARR/FTR Timeline FTR WG February 6, 2013
Background • The scope of the transmission system available for use under the MISO tariff will expand to include the MISO Southern region in December 2013 • MISO will conduct a Partial Year Allocation process for the remainder of the 2013-2014 Allocation Period (12/19/2013 – 5/31/2014)
Partial Year FTR AllocationProcess • Partial Year FTR Allocation will be a single stage Allocation with 100 % of available transmission capacity considering already existing FTRs from most recent Annual FTR Auction • The Nomination will be conducted via spreadsheets and allocation results will be communicated via spreadsheets (email) • Entities can participate in the subsequent FTR Auctions • FTRS will be allocated for two seasons: • 12/19/2013 – 2/28/2014 • 3/1/2014 – 5/31/2014 • Entities will participate in Year 1 Annual ARR Allocation from 2014/15 Planning Period and onwards
Data Gathering • Data Gathering and Registration establishes which transmission services are eligible to participate in the ARR/FTR Allocation • Data evaluation is based on a Reference Year • Reference Year is the year that is used by MISO to determine the initial ARR Zones and ARR Entitlements • Establishes a qualified set of ARR Points of Delivery (sinks) and Resources (sources) • Determines ARR Zones and Reserved Source Points (RSP) • Determines which RSP are Baseload (BRSS) and which are Peak (PRSS)
Data GatheringBusiness Rules • Transmission services eligible for obtaining FTRs/ARRs in the Allocation (These services are from TSR conversion process described in slides 7-8) • Network Integration Transmission Service (NITS) valid during the Reference Year • Yearly firm Point-to-Point (PTP) transmission service valid during the Reference Year • Grandfathered Agreements (GFAs) • Reference year: June 1, 2012 to May 31, 2013 • A Data Gathering Workshop will be held the later part of June 2013
TSR Integration-the Basics MISO Tariff Expansion A more in depth discussion of TSR Integration is available on the MP Training section of the MISO public website
Next Steps • FTR email exploder – Partial Year Allocation status updates • Partial Year Allocation timeline will be posted on the FTR Calendar section of MISO public website • Email notification will be sent out