An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. We are “SLERP”State Lands & Environmental Resources 21 staff 150 person Central District 1 of 6 of regulatory districts Part of DEP’s Division of Water Resources 1 of 3 DEP regulatory divisions

  2. Acting on behalf of… The Governor & Secretary Board of Trustees of the Internal Improvement Trust Fund (Governor & Cabinet) Army Corps of Engineers Two water management districts

  3. Two sides of the house Regulatory = Environmental Wetlands Other resources Pollution Proprietary = State property (sovereign submerged lands) Clear agreements Fair (as per rules) use of land Revenue July 14, 2011

  4. You need an Environmental Resource Permit (ERP) for… • Most land alterations and construction in uplands, wetlands, and other surface waters As per 62-343.050(1), F.A.C.

  5. Typical projects Beltway High speed rail Landfills Power plants Water plants Pipelines Electric/phone lines Single family homes Water Mgt. District projects Special cases Marinas Docks Seawalls

  6. You need State Lands Authorization for… In, on, over, or under state-owned submerged lands Landlord/tenant relationship & agreements Revenue “Cumulative” and concurrent with ERP July 14, 2011

  7. DEP & the Water Mgt. Districts: Division of labor • WMDs • Residential & commercial development • Roads • Agriculture • Associated SSL Authorization w/ the above • DEP • Single family residences • Marinas not associated w/ other upland development • Utilities • Governmental dredging & other “in water” • Sovereign Submerged Lands Authorization tied with these projects Governed by operating agreements as per 62-113, F.A.C.

  8. Commenting agencies and branches: • Florida Fish & Wildlife • Florida Dept. of State Division of Historical Resources • DEP office of Coastal and Aquatic Managed Areas • DEP Division of State Lands • DEP Engineering Evaluation Section • DEP Division of Rec & Parks

  9. Outstanding Florida Waters & Aquatic Preserves Butler Chain Outstanding Florida Waters Wekiva River Outstanding Florida Waters & Aquatic Preserve Econlockhatchee River Outstanding Florida Waters

  10. Impaired Waters Crane Strand & Long Branch Lake Carlton, Beauclair and Apopka Lake Jesup

  11. Our various branches: Delineations Jim Lee 1/8 of an FTE Plays by the rules Head trainer 25 paid delineations per year

  12. Stormwater engineering Deb and Leo ¼ of an FTE Presumptive criteria & new rule “make the world into a better place” Water Mgt. Districts

  13. SLERP permitting Lisa and Erica About ½ FTE 280 permits in four years 200 with State Lands

  14. Key factors in review of applications: No net loss Avoid, minimize, mitigate Water storage Water quality Flushing issue Sovereignty submerged lands Cumulative impacts Secondary impacts Looking for “reasonable assurance”

  15. SLERP compliance • Terry, Jennifer, Leo and the interns • ½+ FTE • Focused efforts: • onsite mitigation • stormwater in impaired basins • Influence the permittee

  16. SLERP enforcement • Pamela, Lauren and Sirena • About ½ FTE • Stay informal • About 80 complaints in Orange County per year • Divide and conquer with EPD • “reasonable” and “discretion”

  17. Key factors in enforcement: “allowable”? Same factors as permitting More grey “Reasonable” application of the law & rules – discretion

  18. Your FTE scorecard BRANCHFTEs Permitting .5 Enforcement .5 Compliance .25 Delineation & training .125 Administrative support .25 Total 1.625 FTEs The importance of experts

  19. 120 rights: • Window that opens - and shuts • Publish public notice • 14 or 21 days to challenge DEP’s intent • Burden of proof • Go to hearing – or forever hold your peace

  20. Tales of the unusual • Pilot projects • General Drive Septage • Alligators in stormwater ponds

  21. Streamlining SLERP • Ongoing: More exemptions, NGPs, self-certs • “LEAN” at direction of Secretary Vinyard • Emphasis on: • Pre-application meetings and “completeness assistance” • Goal: • Issue 90% of permits within 180 days • Keeping score as of July 1 • Since 2005: “Wildly Important Goals”

  22. Noticed General Permits • “Already issued” in 62-341 F.A.C. • $100 fee • No more than one RAI • Artificial reefs • Certain boat ramps • Private docks up to 2,000 sq. ft. • Rip rap in front of seawalls • Culverted roadway crossings & bridges over artificial waters • Some FDOT, county & city road & bridge activities within ROW • Relocation of aerial power & phone lines for road improvements • Certain utility cable, conduit & pipeline installations & crossings • Environmental restoration & enhancement by DEP & WMDs

  23. Self-certifications • Single family docks • Single family dock with a boat lift • Repair or replace of a single family dock • Addition of a boat lift • Notice General Permit riprap at the toe of an existing seawall

  24. “Dry” transmission lines • Little docks • Little boat ramps • Dock repair or replace • Seawall restore or replace • Maintenance dredging of channels • Pipe or culvert repair • Aid to navigation installation • Transmission line placement on or in river/lake • Single family stormwater facilities • Limited plant removal from shorelines • Floating vessel platforms • 403.813, FS Exemptions: De minimis 373.406(6), FS Grandfathered 373.414 (11)-(16), FS

  25. One of the 23% out of compliance