ITSC Meeting BMS Status Update

ITSC Meeting BMS Status Update. IT Team 19-Jan-2005. Next Steps Outlined at 06-Dec-2004 ITSC meeting. Complete by 31-Jan-2005 Vendor Evaluations and Solution Selection Membership Specific Approach

maxine
Download Presentation

ITSC Meeting BMS Status Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITSC MeetingBMS Status Update IT Team 19-Jan-2005

  2. Next Steps Outlined at 06-Dec-2004 ITSC meeting • Complete by 31-Jan-2005 • Vendor Evaluations and Solution Selection • Membership Specific Approach • Engage 2 additional vendors - Avectra, Aptify to understand their membership specific solution to benchmark costs/functionality • Oracle/Strategic Framework Approach • Rationalize fixed price bid from Oracle • Understand Oracle consulting cost drivers • Help prioritize, justify and understand estimated future maintenance costs • Engage 2-3 Oracle partners to benchmark Oracle consulting costs • Complete by 8-Feb-2005 • Confirm Recommendations/High Level Plan/Costs • Prepare recommendation for February Board Meeting

  3. Vendor Evaluation Status • Completed first phase of Proof of Concept (POC) • Initial contenders were eliminated: • Oracle – based on costs ($8.7mm) • ACGI – based on size of company and technology architecture • 2nd set of candidates in final selection process • Avectra • Aptify • Demonstrations and reference reviews are underway

  4. Vendor Evaluation Summary • Key Evaluation Points • User Interface • Support of business capabilities • Streamlined work flow and integration • Total Cost of Ownership (TCO) • Benchmark build versus ongoing maintenance costs • Licensing considerations • Strategic Architecture • Extensibility and flexibility of design for future business needs • Technology framework • Ability to integrate with other applications

  5. Vendor Evaluation Summary to date • Aptify • Offers a membership specific solution • Offers .NET Microsoft architecture which appears flexible, increased availability of out-of-the box functionality and scalable. We are partnering with Microsoft to confirm viability of the technology architecture • Broader set of Association applications/modules, eliminating high number of integration points and offers capabilities/modules that can be used later • Relatively small company, however has been in business since 1993 – does not appear to be a concern • Continue to understand build versus maintain costs relating to TCO • Reviewing vendors ability to support IEEE time to market/business needs over time • Avectra • Same essential points as Aptify • Architecture is not so proprietary and is not as tools driven as Aptify. • Slightly larger company and client base

  6. BMS Preliminary Capital – DRAFT estimates($ Thousands)

  7. BMS Preliminary Expense – DRAFT estimates($ Thousands – through 2008)

  8. Next Steps • Complete by 31-Jan-2005 • Vendor Evaluations and commitment to do a POC • Functional evaluation – Understand scope and high level gaps • Engage vendors - Avectra, Aptify to understand their membership specific solution to benchmark costs/functionality • Architecture and technical evaluation • Engage Microsoft consulting services to help IEEE evaluate the vendors using MS technology (No cost) • Obtain preliminary independent research on Avectra and Aptify • Gain High level understanding of the impact on moving to Microsoft solution • BMS scope and integration approach • Membership Specific Approach • Oracle/Strategic Framework Approach • Determine any relationship that can meet financial requirements

  9. Next Steps continued • Complete by 8-Feb-2005 • Confirm Recommendations/High Level Plan/Costs • Prepare recommendation for February Board Meeting • Continue reference checks • Continue fine tuning Total Cost of Ownership (TCO) • Review Recommendations/High Level Plan/Costs at February ITSC meeting • Gain approval at February Board meetings