An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEP(Martian Environmental Pod) Interim Review #2 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder

  2. Request for Action

  3. Greenhouse x 10 Mounting Box Thermal Petals Electronics Package Platform

  4. Design Changes • Greenhouse/Pressure System • Molding tool design • Thermal Shield/Structure • Keyed aluminum shaft and aluminum sleeve • New assembly order • Electronics/Software • Trimpot

  5. Molding Tool • New design allows for the use of a furnace instead of internal heater • Shelled out to reduce heating time • Rolling method is done by hand on top of grooved plate

  6. Keyed Shaft and Sleeve • Keyed aluminum shaft to eliminate the need for welding • Key • 0.1’’ x 0.2’’ x 0.3’’ • Aluminum shaft • Depth: 0.1’’ • Aluminum sleeve • Depth: 0.2’’

  7. New Assembly Order

  8. Greenhouse/Pressure System • Molding tool is complete • Tested for functionality: • Control valve • Regulator and CO2 tank

  9. Thermal Shield/Structure • Completed petals 1 - 5 using new epoxy • Machined parts for petals 6 - 10 • Machined electronics box parts

  10. Electronic Setup

  11. Software Setup

  12. Software Setup

  13. Electronics Testing • Verified functional operation of: • Pressure transducer • Thermistor • Determined conversion coefficient • LabView

  14. Current Issues • Laser cutter availability/reliability • Solution: sand edges for even mating surface • Outdoor testing -Solution: car inverter for power supply and data acquisition system

  15. To Be Completed: Greenhouse/Pressure System • Molding plate (3/19/04) • Shape Kapton for deployable greenhouse (3/31/04) • Construct greenhouse around acrylic rings (4/2/04)

  16. To Be Completed: Thermal Shield/Structure • Finish constructing thermal shield (3/19/04) • Machine and construct base structure (3/28/04) • Machine aluminum shaft and sleeve (3/31/04)

  17. To Be Completed: Electronics • Integration of Trimpot (3/28/04) • Finish Circuit (4/2/04) • Copper Custom Plate

  18. Integration • Fasten greenhouse to mounting box (3/28 – 3/31) • Assemble final structure (3/28 – 4/2) • Integrate pressure and power sources with electronics package (3/28 – 4/2)

  19. Schedule Progress

  20. Questions?