1 / 22

Instructions for Completing the Print Attribute Results Form

may
Download Presentation

Instructions for Completing the Print Attribute Results Form

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Instructions for Completing the Print Attribute Results Form

    2. In the case of any discrepancies, the current revision of the Climate Control SVPP procedures and work instructions will take precedence over this document. This document is intended as a training aid ONLY. Please contact the Quality Manager at the receiving plant or supplychainsupport@irco.com for clarification of any discrepancies or issues.

    3. Table of Contents

    4. 4 When is SVPP Required? All Parts, Production or Prototype. New Product New product completely or new product to a specific plant. Significant gap in production, (i.e. hasn’t been made for a long time, etc.) Engineering Change New revision level Part number change, etc. Material Change Process Change Change of equipment. Change of sub-tier supplier. Tooling / Die / Mold change. Manufacturing Location Change As supporting documentation for: To document relevant MDA (Material Deviation) information. To verify the part after an MDA has expired. To document Corrective Action results / information. Other changes to part, process, etc????

    5. 5 How to Complete the PAR Form The supplier completes #1 - #7 with the appropriate information. The “Climate Control Internal” areas are completed by Climate Control upon receipt of the SVPP Package.

    6. 6 How to Complete the PAR Form #8 The Symbol field is used for reference symbols as appropriate. It is used to allow the actual dimension to remain numeric, therefore enabling the automatic calculations used in other portions of the document. Symbols may be used other than those shown.

    7. 7 How to Complete the PAR Form #9 & #10 Whenever possible, use only numeric values in these columns. Under normal conditions, do not add units of measure (mm, in, etc.) here. Again, this enables automatic calculations. In the case of documenting notes, please be as specific and detailed as possible.

    8. 8 How to Complete the PAR Form #11 Following the numeric format wherever possible, enter the measured or observed values for the actual samples. When completing fields for notes, be as specific as possible. In most cases “OK” will not be accepted.

    9. 9 How to Complete the PAR Form #12 Enter the actual measurement device/method that was used to determine the result for the samples that are submitted.

    10. 10 How to Complete The PAR Form #13 The supplier is responsible for completing these columns with either “Y” or “N”. The Supplier completes this column with a “Y”, if all 3 samples meet the specified requirements. If any of the samples do not meet the specified requirements, the supplier completes this column with an “N” for that attribute and must contact Climate Control for approval prior to submitting this Print Attribute Report.

    11. 11 How to Complete the PAR Form

    12. 12 Assemblies - Overview All assemblies must have complete SVPP for all components on each level.

    13. 13 Assemblies – Alternatives With prior approval from the Quality Manager at the receiving plant, the following diagrams provide examples of reduced inspection activities for components that are used in multiple assemblies. Note: The examples only apply if all of the assemblies are being submitted at the same time or in a very short time span.

    14. 14 Assemblies (w/Standard Product) Generally in an assembly, Full SVPP is completed down to the level of standard (off-the-shelf) product.

    15. 15 Std. Product Example

    16. 16 Assemblies (w/ multiple “used-in”)

    17. 17 Examples of Completed Forms Sheetmetal Assembly Example

    18. 18 Examples of Completed Forms Sheetmetal Assembly Example

    19. 19 Examples of Completed Forms Sheetmetal Assembly Example

    20. 20 Examples of Completed Forms Sheetmetal Assembly Example

    21. 21 Examples of Completed Forms Cable Assembly Example

    22. 22 Questions???? Contact: supplychainsupport@irco.com

More Related