1 / 8

Simulation Update

Simulation Update. S. Margetis. Issues. Since in August most people were gone the action items are the still the same as listed in Jim’s slide for the BNL meeting (next slide) Inclusion of ‘PileUp’ in full simulations Jim’s hand calculations show small effect (slide 4)

Download Presentation

Simulation Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simulation Update S. Margetis

  2. Issues • Since in August most people were gone the action items are the still the same as listed in Jim’s slide for the BNL meeting (next slide) • Inclusion of ‘PileUp’ in full simulations • Jim’s hand calculations show small effect (slide 4) • Full simulation of IST-less configuration • Some progress in understanding difference between hand and full D0 reconstruction efficiencies • AOB, ie increase statistics for detail GEANT ‘Patch’ studies

  3. Pileup – critical to selling the proposal • A modest proposal • Proposal geometry and configuration (TPC+SSD+IST2+IST2+PXL2+PXL1) • with pileup • without • Reduced configuration with standard geometries (TPC+SSD+PXL2+PXL1) • with pileup • without Does Pileup Matter? Does the configuration matter?

  4. A Prediction – pileup doesn’t matter for a 200 sec detector • Proposal configuration with pileup and UPC electrons • Proposal configuration without pileup and without UPC electrons

  5. Inlusion of PileUp in GEANT simulations - our current scheme • Three sources • Out of time events, UPC e, Beam background • Out of time events are introduced as correlated background from parametrized minbias and zvertex shapes. Infinite momentum (straight line is assumed) • UPC e and Beam background as white noise. Spiraling can be accounted but not as correlated noise. We need guidance about actual numbers here. • Compromises are mostly seconf order effects and due to schedule

  6. In full simulation we used realistic TPC (dead sectors/padrows etc) [perhaps not a good idea] Unassigned hits on tracks All hits

  7. In full simulation Kaons decay properly. Now things are coming together Proposal plot Hand with Kaon decay

  8. Summary • Pile-up work has began • We have a agreed upon scheme • Handshake between Hand/GEANT seems feasible • Tight but possible schedule for End-November review

More Related