1 / 5

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-IG Closing Report for San Diego July 2010 Date Submitted: July 2010 Source: David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless

maylin
Download Presentation

Slide 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:LECIM-IG Closing Report for San Diego July 2010 Date Submitted: July 2010 Source:David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless Voice: +1 (858)592-6008 x221 , E-Mail: david.howard@onrampwireless.com Re:LECIM Closing Report for July 2010 Session Abstract: LECIM Closing Report for San Diego Purpose: Information to 802.15 WG Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 David Howard, On Ramp Wireless

  2. Low Energy Critical Infrastructure Monitoring • Tutorial session 3 Monday PM • Documents 519, 528, 529, 533 presented • Meeting Tuesday AM1 Q/A with Sempra Energy applications requirements • Reviewed and edited applications requirements document 208 David Howard, On Ramp Wireless

  3. LECIM IG • IG Motion: that the LECIM IG request the 802.15 Working Group to seek approval from the 802 EC to form a study group to develop the PAR and 5c documents for the Low Energy Critical Infrastructure Monitoring applications  • Moved by David Howard, seconded by Steve Journey (Semtech) • Upon no discussion the vote was taken with the results of 33 approve, 0 oppose, and 1 abstaining; motion carries. David Howard, On Ramp Wireless

  4. LECIM IG • IG LECIM meeting attendance:  • San Diego 36 • Beijing 68 • Orlando 51, 14 • Summary applications • 6 application presentations • 10 author companies • 15 applications described David Howard, On Ramp Wireless

  5. LECIM IG • SG Motion: that the 802.15 Working Group seeks approval from the 802 EC to form a study group to develop the PAR and 5c documents for the Low Energy Critical Infrastructure Monitoring applications • Moved by David Howard • Seconded by ? David Howard, On Ramp Wireless

More Related