1 / 3

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-IG Closing Report for Orlando March 2010 Date Submitted: March 2010 Source: David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless

purity
Download Presentation

Slide 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:LECIM-IG Closing Report for Orlando March 2010 Date Submitted: March 2010 Source:David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless Voice: +1 (858)592-6008 x221 , E-Mail: david.howard@onrampwireless.com Re:LECIM Closing Report for March 2010 Session Abstract: LECIM Closing Report for Orlando Purpose: Information to 802.15 WG Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 David Howard, On Ramp Wireless

  2. Low Energy Critical Infrastructure Monitoring • Presentations made on Container Tracking Application (15-10-0186-00), 802.15 process for new projects, and Low Energy Critical Infrastructure Monitoring (15-10-0053-00) • Started an applications requirement matrix leading to a technical requirements overview (15-10-208-01-leci) David Howard, On Ramp Wireless

  3. LECIM IG • Extended call for applications until Beijing • Requested two meeting slots at the next Interim session in Beijing • 21 attendees at the Tuesday meeting David Howard, On Ramp Wireless

More Related