Multi-Turn Extraction / L.Ducimetière / 03.10.2011. Kicker options for MTE. Prepared by L.Ducimetière , L.Sermeus. Outline: Reminder : Present MTE dedicated kickers Hybrid extraction using CT elements Faster KFA 13 – 21 (shorter rise time) Stronger KFA 13 – 21.
E N D
Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Kicker options for MTE Preparedby L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated kickers Hybrid extraction using CT elements Faster KFA 13 – 21 (shorter rise time) Stronger KFA 13 – 21
Present MTE dedicated kickers KFA 71 KFA 71 Trajectory Trajectory correction correction core beam kick core beam kick KFA 79 KFA 79 Extraction Extraction line line DFA243 DFA254 Fast Kickers 13/21 • kick all beamlets and • core beam DFA242 DFA242 KFA 21 KFA 21 KFA 13 KFA 13 KFA 4 KFA 4 core beam kick Extraction Extraction Slow Slow Septum16 Septum16 bump16 bump16 Multi-Turn Extraction / L.Ducimetière / 03.10.2011 «Phase 1» construction completed in 2008: - KFA 13/21 for the extraction of the « islands » - +KFA 4 for the corebeam (complementedby KFA 71-79) «Phase 2» pendinguntil the dismantling of the CT: - 5-stair kick for the correctors DFA 242 and DFA 254 - KFA 9 for perfectbumpclosure. Present situation, CT still in use: - 5-stair kick for the corrector DFA 254 usingold RSG generator - 1 staironly for DFA 242 - PPM implemented in 2010 for KFA 9
Hybrid extraction using CT elements Multi-Turn Extraction / L.Ducimetière / 03.10.2011 For a full compatibility CT + MTE : - 5-stair kick for the DFA 242 using the refurbished NSG switches - Refurbishement of RSG switches for the DFA 254 – 10 kCHF, 0.2 MY - Consolidation of BFA 9 tank feedthrough (new oil-free interface), ring oil system – 10 kCHF, 0.1 MY - Update B 359 infrastructure (oilretention, firehazards; full detail in IEFC days, March 2011) 240 kCHF, 2 MY by end LS1 - Full refurbishement of electrical distribution and Electronics&Controls by end LS1 (seeEtienne’s talk for details and M+P)
Faster KFA 13 – 21 (shorter rise time) Multi-Turn Extraction / L.Ducimetière / 03.10.2011 For both KFA 13 and KFA 21, 1 PFN supplies 3 series-connected magnet modules. Shorter rise time can be achieved by energising the 3 kicker modules by independent PFN’s rather than in series. KFA 13, 21 - 3 modules each Possible gain on rise time Series : 327 ns (10-90)% Indep. : 125 ns Series : 388 ns (5-95)% Indep. : 150 ns
Faster rise time for kickers Faster KFA 13 – 21 (shorter rise time) Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Additionalequipmentrequired: ► 4+1 spare PFNs + 2 vacuum tanks ► hydraulicsystems + cooling ►electronics and controls ► new building in PS ring centre KFA 4 KFA 13 KFA 21 Resource estimate(based on equipmentbuilt in 2008): ► Equipment 6.0 MCHF (2008 prices) ► New building 1.0 MCHF (250 m2 @ 4 kCHF/m2) ► Manpower (staff) 12 MY (not presently available) ► Time to completion t0 + 2.5 Y in building 367 (same as POPS !!)
Faster rise time for kickers Stronger KFA 13 – 21 Multi-Turn Extraction / L.Ducimetière / 03.10.2011 • Increasing the strength of the KFA13 – 21 have been suggested to give more clearance at septum 16. • However : • Magnets already operating in short-circuited mode • No room for additional magnets • Nominal operating voltage provides no margin: system working with only 6% margin from the design/test voltage • (10% recommended) • Many component already at the limit (cables connectors, HV capacitors, cables)
Faster rise time for kickers Summary Multi-Turn Extraction / L.Ducimetière / 03.10.2011
Faster rise time for kickers Summary Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Most of the MTE dedicated kickers are in operation, except corrector DFA242 with 5 stairs
Faster rise time for kickers Summary Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Most of the MTE dedicated kickers are in operation, except corrector DFA242 with 5 stairs Keeping CT for combined use is an option Requires a large safety overhaul program (in LS1) Cost M = 260 kCHF, P = 2.3 MY
Faster rise time for kickers Summary Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Most of the MTE dedicated kickers are in operation, except corrector DFA242 with 5 stairs Keeping CT for combined use is an option Requires a large safety overhaul program (in LS1) Cost M = 260 kCHF, P = 2.3 MY Faster KFA 13 – 21 kicker : not cost efficient Reduce losses on SMH16 by factor ~ 2, but Cost M = 7 MCHF, P = 12 MY, T = 2.5 Y, S = 250 m2
Faster rise time for kickers Summary Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Most of the MTE dedicated kickers are in operation, except corrector DFA242 with 5 stairs Keeping CT for combined use is an option Requires a large safety overhaul program (in LS1) Cost M = 260 kCHF, P = 2.3 MY Faster KFA 13 – 21 kicker : not cost efficient Reduce losses on SMH16 by factor ~ 2, but Cost M = 7 MCHF, P = 12 MY, T = 2.5 Y, S = 250 m2 Increased strength of KFA 13 – 21 : not really an option
Faster rise time for kickers Summary Multi-Turn Extraction / L.Ducimetière / 03.10.2011 Most of the MTE dedicated kickers are in operation, except corrector DFA242 with 5 stairs Keeping CT for combined use is an option Requires a large safety overhaul program (in LS1) Cost M = 260 kCHF, P = 2.3 MY Faster KFA 13 – 21 kicker : not cost efficient Reduce losses on SMH16 by factor ~ 2, but Cost M = 7 MCHF, P = 12 MY, T = 2.5 Y, S = 250 m2 Increased strength of KFA 13 – 21 : not really an option Expecting clear roadmap from this workshop LS1 program needs advance scheduling