An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cooling and Ventilation(S. Deleval) • Status for • SM18 • Bldg 892 • Bldg 163 • Bldg 180 • Implications for laboratories

  2. Cooling for SM18 Primary water Cryo plant: Compressors, cold box, vacuum pump ≈ 250 m3/h • Primary circuit: • 3 cooling towers (2 initialy) • 1 distribution pump of 520 m3/h • 1 back up pump (300 m3/h) • 18 years old never refurbished • Control S5 RF cooling station: 65m3/h No stand by pump Control S5 Demineralised water String cooling station: 150 m3/h No stand by pump Control S5 Demineralised water

  3. Cooling for SM18 • Primary circuit: • Poor condition of the piping • Change the control system • motors of the fan to replace • Non conformity for the water treatment • Regulating valves running out of spares Increasing the primary cooling capacity of the SM 18 ? - SPS ring already overloaded. - No room in the pumping station • Demineralised water circuits : • Change the control system • Good state • Add one stand by pump ?

  4. Cooling for bldg 163 Primary water Cryo lab: Compressor (in bldg 253) 22 m3/h Compressor + aux.(in bldg 163) 20 m3/h Compressor + aux.( in bldg 165) 37 m3/h • Primary circuit of the Bldg 201: • 2 cooling towers for a total of 2 MW • 2 distribution pumps of 175 m3/h • Installed in 2002 Other users: compressed air production of Meyrin, chillers of bldg 13, … ≈ 90 m3/h • EST area cooling station in Bldg 355: • Cooling capacity of 10 MW • 3 distribution pumps of 300 m3/h • Refurbished in 2003 Fresca: Cable testing ≈ 13 m3/h Demineralized water

  5. Cooling for 163 • Primary circuit of the Bldg 201: • good state, no particular problem • Increasing the primary cooling capacity of the 163 ? • An increase of 10% of the cryo lab cooling load without any work • Demineralised water: • Physics stops of the Est area because of the bldg 163 • Shutdown not compatible with Fresca activities Even with the same load a new specific demineralized cooling station has to be installed

  6. Cooling for Bldg 180 Cryo plant: 3 Compressors (bldg 279) and 1 (bldg 180), cold box, ≈ 250 m3/h Primary water • West area cooling station: • 3 cooling towers : 21MW • Omega circuit : 1distribution pumps of 250 m3/h Atlas cooling station: ≈13m3/h Demineralised water Demineralised circuits For the west area

  7. Cooling for bldg 180 West area cooling station: No maintenance for many years. Can't run without a major renovation (control, electrical and mechanical parts) Upgrade of the water treatment needed. Increasing the cooling capacity is possible. • Demineralised water cooling station for the bldg 180: • good state • Ventilation of the bldg 180: • several air handling units out of order, no spare parts → temperature beneath 10 C in the bldg.

  8. Cooling for bldg 892 Primary water Cryo : 7 compressors (6 running at the same time, diffusion pump,.. ≈240 m3/h • North area for primary circuit : • 4 cooling towers of 12.7 MW • 5 distribution pumps of 763 m3/h • 33 years old never refurbished • Control S5 • Cooling station of the Bldg 867: • Cooling capacity of 940 kW • 2 distribution pumps of 105 m3/h • Control system changed in 2008 Power supplies ??? m3/h Demineralized water

  9. Cooling for bldg 892 • Primary circuit: • Control consolidation is needed • Increasing the cooling capacity ? • - Primary flow can be increased • Demineralized water circuit: • - 1 pump to replace • Maximum load on the low pressure circuit • Increasing the cooling capacity ? • - Will be costly

  10. Summary • SM18: • several consolidations for a good reliability • Increase the cooling capacity could be very costly • Bldg 163: • Fresca should have a dedicated demineralised water cooling station. • Bldg 180: • Major works to implement for the primary water to be able to restart the system • The cooling capacity for the primary circuit is high but no increase possible for • demineralised water. • Blgd 892: • Control consolidation has to be carried out • The cooling capacity for the primary circuit is high but no increased possible for • demineralised water.