1 / 9

Key Issues – Spray Fire-Resistant Materials (SFRM) John Dalton, GCP Applied Technologies

This article explores the main challenges faced by SFRM manufacturers, including non-compliant products, plastic components in fire-rated designs, primed steel, heat transfer, and performance-based design.

mcgeorge
Download Presentation

Key Issues – Spray Fire-Resistant Materials (SFRM) John Dalton, GCP Applied Technologies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Key Issues – Spray Fire-Resistant Materials (SFRM) John Dalton, GCP Applied Technologies Russ Harvey, Isolatek International

  2. Key issues for SFRM manufacturers • Non-compliant products • Plastic as a component of fire-rated designs • Primed / painted steel • Heat transfer • Performance based design

  3. # 1 – Non compliant Products • The industry is full of non-compliant products trying to pass themselves off as compliant. • Generally speaking they are IFRM products • Tested at some obscure testing facility • No load • Small furnace • Testing is again very limited but will have some sort of “UL” approval

  4. # 2 - Plastic as a component of fire-rated designs - insulation have on fire resistance rating and performance assemblies? • Simple answer is we don’t know. • Previously (and maybe still) UL approved the use of a topcoat that had good ASTM E-84 properties (low flame spread and smoke development) but how does that change when the topcoat is a polyurethane foam that meets those UL criteria but also requires a thermal barrier? • Note that the fire test used to approve thermal barriers is far less severe (heat and time) than that for floor assemblies • Does the presence of a highly combustible material in direct contact with the SFRM (and yes, even occasionally IFRM) affect the rating?

  5. Unofficial application guidelines suggest the use of column designs • Approval for the use of column designs for HSS beams should always be accompanied with approval from UL or the design professional prior to spraying. • Following manufacturer suggestion contradicting a tested assembly or UL’s position may not shield the installer from liability.

  6. # 3 – Primed steel • Generally there is no need to prime steel that will be used in interior conceal • It is not needed for the majority of steel • Adds significantly to the cost • Lath • Bonding agent • Only 1 UL approved primer for structural steel • Primer on decking – generally a really bad idea – lath the lot!!!!

  7. # 4 – Heat transfer • There is nothing in the UL Directory (aside from a comment about joist bridging) or in the IBC that mandates a 12” spray out of fireproofing onto non-rated members.

  8. # 5 - Performance Based Design * * [LaMalva, K. (2018) ‘Developments in Structural Fire Protection Design – U.S. Perspective,’ The Structural Engineer] * Recognized by designers since the 1980s or perhaps earlier (Pettersson 1975, Law 1981) • Structural performance: Capacity > Demand 8

  9. # 5 - Performance Based Design * * 9

More Related