Contents of Presentation • Bridge Management Influences • Code of Practice for The Management of Highway Structures. • Implementation of the Recommendations. • Review of Progress. • Research Opportunities.
Bridge Management Influences Asset Valuation Asset Management Planning Code of Practice Performance Measures
Code of Practice for the Management of Highway Structures plus research initiatives The Asset Management Rainbow… We know what we have got. We know what it is worth. We know what condition it is in. We know what condition it should be in. We know the optimal way to close the performance gap. We know our long term forward programme. We know that we will be able to secure the necessary funding. We know that we have a BMS to manage the data.
Contents • Foreword • Executive Summary • Introduction • Management Context • Asset Management Planning • Financial Planning and Resource Accounting • Maintenance Planning And Management • Inspection, Testing And Monitoring • Assessment Of Structures • Management Of Abnormal Loads • Asset Information Management • 10. Framework for a Bridge Management System • 11. Implementation of the Code The Code 2. Management Context
ENGINEERING PROCESSES SHORT TERM PLANNING LONG TERM PLANNING 2. Management Context 6. Inspection, Testing and Monitoring 3. Asset Management Planning 5. Maintenance Planning and Management 7. Assessment of Structures 4. Financial Planning and Resource Accounting 8. Management of Abnormal Loads 9. Asset Information Management 10. Framework for a Bridge Management System
Implementation • There is a statutory obligation on highway authorities to maintain the public highway (Highways Act, 1980) • Safe for Use requires a highway structure to be managed in such a way that it does not pose an unacceptable risk to public safety (31). • Milestone One – March 2006. • Fit for Purpose requires a highway structure to be managed in such a way that it remains available for use by traffic permitted for the route (32). • Milestone Two – March 2007.
Implementation Good Management Practice (17) • Customer focused asset management approach. • Deliver required Levels of Service. • Minimise whole life costs. • Make optimum use of resources. • Provide a sustainable programme of work • Milestone Three – March 2008 to March 2010
Review of Progress • CSS Bridge Management System Survey • CSS Code of Practice Implementation Survey.
We comply with Milestone One, with only a few gaps left to be filled. We partially comply with Milestone Two. We do not comply with Milestone Three. No idea until I study Code of Practice. (Not familiar with this document as yet!) We have a lot of what is recommended in place at the moment. We are just completing our first attempt at a transportation asset management plan, and we will now begin to look at the areas where we have gaps in our data and management systems e.g. valuation, prediction models, whole life costing and some aspects of performance monitoring. We are currently working with SERCO regarding abnormal load vetting using ESDAL and so will be interested to see how their system develops in 2006.
Review of Progress Average Rating Ratings < 2 Milestone None 4.09 One 10 3.21 Two 7 2.94 Three The need has been recognised and a plan for implementation is currently being developed.
Milestone 3 • 2. Management Context 3.67 • 3. Asset Management Planning 2 • 4. Financial Planning 3 • 5. Maintenance Planning 2.75 • 6. Inspection, Testing & Monitoring 4
Milestone 3 • 7. Assessment of Structures 4 • 8. Management of Abnormal Loads 2 • 9. Asset Information Management 3 • 10. Framework for a Bridge Management System 1
ENGINEERING PROCESSES SHORT TERM PLANNING LONG TERM PLANNING 2. Management Context 6. Inspection, Testing and Monitoring 3. Asset Management Planning 5. Maintenance Planning and Management 7. Assessment of Structures 4. Financial Planning and Resource Accounting 8. Management of Abnormal Loads 9. Asset Information Management 10. Framework for a Bridge Management System
Research Opportunities • Establish a regime for the asset valuation of highway structures in accordance with the CSS document • Develop and implement components of the AM Regime needed to deliver the Advanced AM Planning process for highway structures • Develop and implement lifecycle plans for all groups and sub-groups of highway structures
Contents • Foreword • Executive Summary • Introduction • Management Context • Asset Management Planning • Financial Planning and Resource Accounting • Maintenance Planning And Management • Inspection, Testing And Monitoring • Assessment Of Structures • Management Of Abnormal Loads • Asset Information Management • 10. Framework for a Bridge Management System • 11. Implementation of the Code The Code 3. Asset Management Planning
Excellent Good Fair Poor Critical Failed = Maintenance Costs = Total Costs = Capital Costs = User Costs Finding the Right Level of Funding Costs Condition Index
Contents • Foreword • Executive Summary • Introduction • Management Context • Asset Management Planning • Financial Planning and Resource Accounting • Maintenance Planning And Management • Inspection, Testing And Monitoring • Assessment Of Structures • Management Of Abnormal Loads • Asset Information Management • 10. Framework for a Bridge Management System • 11. Implementation of the Code The Code 4. Financial Planning
Valuation • Whole of Government Accounts • Gross Replacement Cost • Dimension x unit rate • Depreciation • Condition related • Asset Valuation
Contents • Foreword • Executive Summary • Introduction • Management Context • Asset Management Planning • Financial Planning and Resource Accounting • Maintenance Planning And Management • Inspection, Testing And Monitoring • Assessment Of Structures • Management Of Abnormal Loads • Asset Information Management • 10. Framework for a Bridge Management System • 11. Implementation of the Code The Code 5. Maintenance Planning
How will the structure deteriorate from here? Structure Condition Metal Bridge Concrete Bridge Masonry Bridge Time
Summary • Engineering Processes are Satisfactory • ESDAL for Management of Abnormal Loads • Existing Decision Support Tool for BMS • Lifecycle Plans • Depreciation • Levels of Service for Highway Structures • Highway Structures Asset Management Planning