2010 Construction Contract Standards Training. Part 2 2010 Standard Specifications. November 2011. 2010 Standard Specifications. Divided into 11 Divisions and 99 Sections Some sections are moved and renamed, reserved, and added Division XI, Building Construction is added . outline.
E N D
2010 Construction Contract Standards Training Part 2 2010 Standard Specifications November 2011
2010 Standard Specifications • Divided into 11 Divisions and 99 Sections • Some sections are moved and renamed, reserved, and added • Division XI, Building Construction is added
outline • Standard Specification changes • 2006 Boilerplate SSP’s that need to be manually inserted • SSP’s that have moved • Supplemental work items
Standard Spec Highlights • Division I • Section 1-1.02 Style Variations – brief listing of plain language change and terms
Standard Spec Highlights • Section 1-1.06 Abbreviations, includes a Bid Item List Abbreviations table. • Section 4-1.03 Work description - instructs the contractor to construct the work described in the Notice to Bidders and the contract. So prepare a good work description.
2010 Standard Specificationschanges • Section 4-1.05 Changes and Extra Work. (was Section 4-1.03D Extra Work in the amendments and 2006). “Extra work” is now called “change order work”. See the “Wording Changes” in your tools binder on how to state it. • Section 4-1.06 Differing Site Conditions. (was Section 5-1.116 of the amendments)
Standard Spec changes • We moved but we’re still bid items • Section 8-1.02 Schedule. (was Section 8-1.04 Progress Schedule in the amendments) There are 3 Levels of CPM Schedule in 2010. • Section 9-1.11 Time Related Overhead. (was SSP 08-017 or 08-018)
2010 Standard Specificationschanges • Payment is now in Section 9. You need to be familiar and know this section as you QA or write a spec. • Section 9-1.16D Mobilization. (was Section 9-1.07D in the amendments and Section 11 of the 2006 Std Specs.)
2010 Standard Specifications(Continued) • Division I General Provisions • Division II General Construction to Division X Materials. • Division XI Building Construction. There is only one section in this division. Provisions are all going to be SSPs that will be added in this section.
Moved to the city • 5-1.32 Areas for Use (was SSP S5-240 Areas for Contractor’s Use) p. 43 • 7-1.07B Seal Coat Claims (was SSP S5-200 Damage Claims) p. 77 • 13-4 Job Site Management (was SSP 7-346 Construction Site Management) p. 174
Ex boilerplate SSP’s • 2-1.03 Mandatory Pre-bid Meeting (was S2-100) • 3-1.18 Early return /early start (S3-092) • 8-1.04D • 5-1.09A Partnering (Dispute Resolution) (was S5-155) • 8-1.10A cost for Cost + Time (renter)
New address • SSP 2-1.06B Supplemental Project Information. (was SSP S5-280) • SSP 5-1.20C Railroad Relations. (was Section 13 Railroad Relations) • Old Section 4 • SSP 8-1.04C Delayed start • SSP 8-1.04F Flex start (Smart start)
New address • SSP 9-1.16C partial pay (was S5-250) • New tool – Bid Item List
Moved to a new neighborhoodbut please don’t forget us • Need Supplemental Work Items • Section 4-1.07C Value Analysis Workshop. (was section 4-1.035 in the amendments). • Section 5-1.09 Partnering. (was Section 5-1.012 in the amendments) • Section 5-1.43E(2) Dispute Resolution Advisor for contracts worth $3M to $10M. • Section 5-1.43E(3) Dispute Resolution Board for contract worth over $10M.
Moved to a new neighborhoodbut please don’t forget us • Need Supplemental Work Items • Section 9-1.07 Payment Adjustments for Price Index Fluctuations. (also rented) SW item (066670)
Moved to a new neighborhoodbut please don’t forget us • Need State Furnished M’tls & Expenses item • SSP 6-2.03 Department-Furnished Materials. (was S8-M10 State Furnished Materials)
Moving out of town • Section 7-1.11D Training. (was Section 7-1.50D in the amendments) The number of trainees or apprentices for the federal training program moved to the Notice to Bidders.
2010 Standard Plans • Incorporated 2006 NSPs and RSPs • Revised texts to all uppercase, except abbreviations, symbols and notes • Relocated “Specs” from Std Plans to Std Specifications
2010 Standard Plans • Deleted 2006 Std Plan T7, Const Project Funding ID Sign, in the 2010 Std Plans. SSP refers to HQ Traffic Ops. Web site for details. • Did not include proprietary crash cushions and MBGR terminal system end treatments
2010 Standard Plans • Updated technical contents: • Revised standard MBGR height from 27-3/4" to 29" per FHWA memo • Redesigned crib walls, retaining walls and box culverts based on Load and Resistance Factor Design (LRFD) • There’s a digest of changes on the web site under the Std Plans link.
2010 Standard Plans List • Process works the same • Edit the same as for previous editions • Place the edited Std Plans list at the beginning of the SP_TEMPLATE (template)
2010 Standard Specifications (Continued) Any questions?