Development Workgroup 0282. Action 018 – impact on RbD 13 September 2010. Action 0282/018 . “xoserve RbD expert to consider the proposal impacts and provide a view/attend the next meeting” This action refers to treatment of SSP vacant sites in the RbD calculations. What is RbD?.

meira
Download Presentation

Development Workgroup 0282

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010

  2. Action 0282/018 • “xoserve RbD expert to consider the proposal impacts and provide a view/attend the next meeting” • This action refers to treatment of SSP vacant sites in the RbD calculations

  3. What is RbD? • Reconciliation by Difference is the substitute for meter point reconciliation in the SSP market • SSPs receive energy allocation and commodity charges via NDM Daily Allocation process • Individual meter readings are not used to reconcile SSPs • Within each LDZ, every LSP rec has an equal and opposite entry in RbD – both energy and commodity charges • RbD charges are apportioned on basis of live (not isolated) SSP AQ • Monthly RbD values are dependent on the number and value of LSP Recs in the month • RbD energy is usually a small fraction of commodity allocation

  4. Comparison to other existing/future scenarios Capacity Energy Commodity RbD Allocation Allocation Smear • Isolated & Withdrawn sites    • Isolated sites √    • DWG 0270 – Elective Meter Point Rec for SSPs • Proposed treatment √ √ √ √ • DWG 0282 – Vacant sites • Suggested treatment √   √

  5. Financial Impacts of RbD • For the 12 months to July 2010, RbD represented 2.2% of total SSP Allocation • % varies between months depending on levels of reconciliation and allocation and financial adjustments

  6. Assessment of Suggested Treatment • No precedent for sites being subject to RbD but not allocation • No parallel with DWG 270 Elective Meter Point Rec proposal • Those sites remain in Allocation • Retaining those sites in RbD shares the unaccounted for gas across all active SSPs • Leaving those sites in RbD should be a simpler change • Leaving Vacant sites in RbD is not consistent with similar scenarios, e.g. Isolations • Risk of erroneous isolation is borne by remainder of SSP market • No reduction in complexity of change