Internet Assisted Review Focus Group June 3, 2002
Agenda • 2nd Review of Streamlining Sample Screens and requirements • 2nd Review of IAR Control Center Sample Screens • Edit Phase Requirements • Summary Statement Assembly Requirements • Reports Requirements
Streamlining Sample Screens
Streamlining Requirements Scope Document Section 5.11
Related Requirements Question • IAR Control Center Section 5.2, #17 • The IAR Control Center should allow SRA/GTA to toggle show/hide preliminary scores from all Reviewers in IAR. If Scores are hidden, Reviewer would only see scores they’ve entered. • Related to Streamlining Section 5.11, #17 • If scores are not visible (as designated by SRA/GTA in Control Center) Reviewer will not see score portion of score matrix – they will only see lower half.
Edit Phase Requirements Scope Document Section 5.12 • Are there any major differences between Submit and Edit Phases? • Is separate section necessary or can same functionality apply?
Summary Statement Assembly Requirements Scope Document Section 5.13
Reports Requirements Scope Document Section 5.14
Future Meeting Schedule and Topics • June 10th (Rockledge II 3014):Program Officer Access, Closure, Other • (needs to be scheduled)June 21st: IAR Focus Group Review of all Screens with final sign-off for version 1 (Navigational Prototype) • (needs to be scheduled)July 1st or later: RUG Review of Navigational Prototype • OER Internal Review • Critical Design Review • Fall 2002: Pilot of Version 1 (for only 1 or 2 study sections)
Thanks for your participation! • Minutes and meeting related documents will be posted at http://era.nih.gov/areas/rev/index.cfm • Next IAR Focus Group Meeting: • Monday, June 10, 2002, 1:30 – 4 pm • Rockledge II Room 3014