An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Enhanced Interconnection Optimization Project André Mendes Chief Technology Integration Officer PBS

  2. Enhanced Interconnection and Optimization Project • Improve station efficiency in operations while maintaining local control • Does not replace NGIS – builds upon the capabilities of the NGIS • Participation in EIOP is a station choice • Non-participating stations retain all advantages of NGIS efficiencies

  3. Project Objectives • Create a replicable, self contained, reliable, expandable and serviceable, broadcast infrastructure (the “Model Station”) that allows: • Member stations to operate their PBS related channels with a substantial reduction in the number of redundant functions, manual processes and error introduction through: • Automated channel operations • Multi-level automated systems monitoring • Remote problem identification, resolution and escalation • Remote hosting of scheduling, traffic and underwriting functionality

  4. Project Objectives • Seamless melding of nationally distributed real time and non real time programming with station produced, provided and ingested content into a locally controlled and monitored “on air” schedule • Operation at a sustained 99.99% availability and with a two hour response time to major component failure.

  5. Development Consortium Members

  6. P1 P1 P3 P3 P2 P2 P1 P1 P3 P3 P2 P2 P3 P3 I1 I1 I2 I2 M1 M M1 M2 M2 M M3 M M3 M2 M1 M3 M1 M3 M3 M2 M1 M3 M1 M2 M2 M1 M3 M2 M1 M2 M3 P1 P1 P3 P3 P2 P2 Content aggregation workflow Other WGBH/WNET PBS Orion / Broadview Omneon / Adic Member Station NETA/APT Local Production Omneon Edge Server

  7. P1 P1 P3 P3 P2 P2 P1 P1 P3 P3 P2 P2 P3 P3 I1 I1 I2 I2 M M M P1 P1 P3 P3 P2 P2 Content distribution workflow Member Station PBS SES Americom Omneon / Adic Omneon Edge Server IP over Satellite

  8. M3 M1 M2 M3 M1 M3 M2 M M3 M1 M2 M M M1 M1 M3 M2 M3 M3 M2 M1 M3 M2 M1 M1 M3 M2 M1 M2 M2 M1 M3 M2 Schedule/Avails workflow PBS Schedule PBS Member Station Orion / Broadview Ch. Schedule 1 PBS Connect/MS AD 2 Broadview Schedule 3 Login to Connect Authenticated User Broadview Avails Start Broadview Scheduling Create/Modify Schedule Start Broadview Avails Sell/Manage Avails

  9. P1 P3 P2 P1 P1 P3 P2 P3 I1 I2 M1 M1 M2 M1 M1 M3 M2 M3 M2 M1 M3 P1 P1 P3 P2 Station Operations workflow Ch. Schedule 1 EAS Omnibus Automation Local Content Omneon Server Miranda Imagestore Live Programs Pledge Emergencies Omneon Storage Close Cap / V-Chip Miranda Signals Probe Satellite Feeds Live Programs Near Live Package Feeds ATSC Encoder/Mux Datacasting

  10. Station Monitoring workflow Video To Transmitter Video From Transmitter Contacts Playlist SNMP/ APP Proxy Presmaster Panel Miranda Imagestore Miranda Probe/Allegro Miranda Probe/Allegro Close Cap / V-Chip ATSC Encoder/Mux Omnibus Automation Omneon Server

  11. Proposed Consortium timelines (development) • Initial Conference call and project kickoff – 5/6/03 • Progress report call – 5/16/03 • Finalize initial hardware/software specs – 5/23/03 • Initiate onsite configuration – 5/27/03 • Progress report calls –5/30, 6/13, 6/27, 7/18, 8/1, 8/15 • Conference Room Pilot 1 – 8/18/03 • Conference Room Pilot 2 – 8/25/03 • User Acceptance Testing 1 – 9/2/03 • User Acceptance Testing 2 – 9/9/03

  12. Proposed Consortium timelines (deployment) • “Model Station” initial deployment – 9/15/03 • Stress testing, tuning &demonstrations – 9/15/03 - 2/15/04 • Press articles and interviews – September 03 - March 04 • Broadcast Engineering, TV Broadcast, TV Technology • Computerworld, InfoWorld, Information Week • Market availability – 3/15/04 (pre-NAB) • PBS Tech Conference/NAB Presentations – April 15-24/04 • First parallel “live” PBS Station – 6/14/ 04 • First live PBS Station – 7/5/04

  13. P2 P1 P2 P2 P1 P1 P1 P2 P2 P1 P1 P2 P2 P1 P1 P2 P2 P1 P1 P2 P1 P2 M2 M2 M1 M2 M1 M1 M1 M2 M1 M2 M1 M2 Public Television’s Content Supply Chain Manufacturing Distribution Retail Consumer WGBH/WNET Traffic and underwriting Hosted scheduling & underwriting Local production Orion/Broadview Transmitter NETA/APT Edge server, automation, branding & ATSC encoding Server & Archive Cable Head end Other Producers Monitoring & resolution Monitoring & resolution Hardware, software, audio and video monitoring DBS Feed

  14. Questions?