APEX Schedule March 8 2006

APEX Schedule March 8 2006. injection. store. BPM fixed trigger TJS, RobM. Collimation in Phenix KAD. Beam based sextupole polarity YL TS Third order resonance correction. Back 2 physics. Optics MBai. Stochastic cooling test MJB, MMB. 8:00. 10:00. 12:00. 1:00. 4:00.

meli
Download Presentation

APEX Schedule March 8 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX Schedule March 8 2006 injection store BPM fixed trigger TJS, RobM Collimation in Phenix KAD Beam based sextupole polarity YL TS Third order resonance correction Back 2 physics Optics MBai Stochastic cooling test MJB, MMB 8:00 10:00 12:00 1:00 4:00 5:00 • 2:00 pm: dry run of Simons • Cogging/uncogging • STAR event display • FCP, PFI, PWS, Christie

  2. Summary of March 8 APEX Lost 3+ hours on cooling water problems in AtR Experiments agreed to allow 1 extra h of APEX (we ended at 6 pm) • BPM “fixed trigger” (Michnoff, Satogata)slide • Stochastic cooling test of aperture at kicker at injection (Brennan, Blaskiewicz). DONE. result: horizontally well centered – vertical +6mm vs –3 mm drop 3 mm at the next maintenance • Beam-based sextupole polarity (Luo,Satogata)slide • Optics (Bai): done at injection, rescheduled at store • Study of radiation in Phenix detector, work on collimation for STAR and Phenix (Drees) - DONE

  3. BPM trigger test Michnoff, Satogata Bpm’s operational so far in auto-trigger – to start (easier to get signals) – plan is to switch to fixed-trigger Problem: beam intensity now just about in between gain 1 and 10 (~0.7-0.8 1011 existing threshold) Last APEX: data taking towards fixed trigger BO6 BPM’s were converted to fixed trigger  ramp data comparison (picture fill 07580 07586) Fixed trigger Auto-trigger

  4. Beam based sextupole polarity check Luo, Satogata • Validation of method • 1/3 blue ring done • Will do the ‘production’ • in the next 1-2 weeks

  5. Optics measurements Bai • Improvement in BPMs • Improvement in algorithm, • now completely model • independent • Glitch in the • calculation of • beta* in IR6 • Deferred store with improvement in BPMs and modified algorithm that is 100% model independent

  6. APEX Schedule March 14-15 2006 Store 6x6 injection injection 2/3 resonance compensation Luo + team Calibration of Shottky Tunes Emittance Chromaticity Cameron DellaPenna Optics + Gradient with AC Dipole Bai Preparation 10 Hz orbit Feedback Montag Michnoff Schultheiss Spin Tune Bai Bravar Itaru Gill Optics Bai Commissioning Lumi-emittance measurement Dejan, Gassner Bellavia, Tseng 10pm 1am 3am 4am 5am 6am 8am AGS LOTO Parasitic during the day Jet is “dimming”….