ISAS Update. Prepared by Brenda Ambrosi ISAS Chair October 14, 2011. Regional Interchange Criteria Work Group (RICWG). All interchange related Regional Criteria are being rewritten as part of INT Rewrite Project (WECC-0076-0082) or other Drafting Teams

melita
Download Presentation

ISAS Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISAS Update Prepared by Brenda Ambrosi ISAS Chair October 14, 2011

  2. Regional Interchange Criteria Work Group (RICWG) • All interchange related Regional Criteria are being rewritten as part of INT Rewrite Project (WECC-0076-0082) or other Drafting Teams • Currently there is no additional work for RICWG to perform

  3. INT Rewrite Project • WECC-0076 / INT-003-WECC-CRT-2 • Interchange Pre-scheduling Criterion – Reposted for further comments with recommendation of making into a guideline • 10 entities provided comments: • 1 supported reclassification into a guideline • 9 opposed reclassification into a guideline • WECC-0077 / INT-004-WECC-CRT-2 • Reliability Curtailments and Reload Criterion –Reposted for further comments

  4. INT Rewrite Project • WECC-0078 / INT-009-WECC-CRT-2 • Capacity Tag – Reposted for further comments • WECC-0079 / INT-011-WECC-CRT-2 • Ten Minute Recallable for Reserves Criterion – Reposted for further comments • WECC-0080 / INT-014-WECC-CRT-2 • Contingency Reserve Responsibilities – Comments received warranted redraft

  5. INT Rewrite Project • WECC-0081 / INT-015-WECC-CRT-2 • WIT Validation – Comments received warranted redraft • WECC-0082 / INT-016-WECC-CRT-2 • Electronic RFI – Reposted for further comments

  6. Real Time Scheduling Work Group (RTSWG) • WECC-0086 / INT-005-WECC-CRT-2 • Real Time Scheduling Emergency Curtailment Procedure – Drafting will commence when drafting of WECC-0087 concludes • WECC-0087 / INT-008-WECC-CRT-2 • Dynamic Schedules – Reposted for further comments

  7. After-The-Fact Work Group (ATFWG) • Reclassifying ATF Criterion into a Guideline as previously approved • ATFWG expects to have the final document posted in early 2012

  8. E-Tag Issues Work Group (EIWG) • Issue taken to Joint Guidance Committee (JGC) concerning whether a Balancing Authority has the right or responsibility to deny a Request for Interchange if they believe the information provided is inaccurate to the detriment of reliability • Action Item for JGC Chair to send email to ISAS Chair with formal response

  9. Electronic Scheduling Work Group (ESWG) • ISAS directed ESWG to suspend e-Tag test bed effort and focus its attention on analyzing a redundant Tag Authority service for WIT • OATI has provided assurance that the Tag Authority Service has sufficient back-up and will present on this matter in January

  10. ISAS 2012 Meeting Dates • January 19-20 • April 18-19 • August 15-16