200 likes | 290 Views
Ship Structure Committee. SR-1465: Large High Speed Aluminum Vessel Design Guide and Training – Task Kick-Off Brief. William H. Mish, Jr. – Program Manager / Senior Structural Engineer Tim Lynch – Structural Engineer / Project Lead Sam Cobaugh – Administration 22 September 2010. Agenda.
E N D
Ship Structure Committee SR-1465: Large High Speed Aluminum Vessel Design Guide and Training – Task Kick-Off Brief William H. Mish, Jr. – Program Manager / Senior Structural Engineer Tim Lynch – Structural Engineer / Project Lead Sam Cobaugh – Administration 22 September 2010
Agenda Objective Statement of Work Resolution of Differences in the SOWs Approach Description of Deliverables / Meetings Plan of Action and Milestones Discussion Large High Speed Aluminum Vessels Design Guide and Training
Objective Develop a design guide and training program suitable for use by the marine industry for the design of large, high speed aluminum ship structures. POP: 12 months from time of award ( 24 Sept 2010 – 23 Sept 2011) Large High Speed Aluminum Vessels Design Guide and Training
Task 1* *Per TI #2010-134 signed 30 Aug 2010 Schedule and participate in project kick off meeting to review the project scope and objectives with the Ship Structure Committee (SSC) technical committee. Organize and conduct kick off meeting – Wednesday, 22 Sept 2010, Gryphon (80 M St.) Large High Speed Aluminum Vessels Design Guide and Training
Task 2* *Per TI #2010-134 signed 30 Aug 2010 Collect project technical data and industry best practice information. Collect and review open literature, class information, aluminum industry guidance and analytic[al] tools to produce an understanding of the current state of knowledge and practice. Based upon this review, develop an outline for the technical guide and circulate to the project technical committee for review and comment. Gryphon has a library of books, journal articles, specifications, design guides, etc., and we are in the process of obtaining additional relevant references. Deliverable: Draft Design Manual Outline (submitted to TPOC on Monday, 01 Nov 2010) Meeting: Committee Comment Discussion – Tuesday, 16 Nov 2010, Gryphon (80 M St.) Deliverable: Revised Design Manual Outline (submitted to TPOC on Monday, 22 Nov 2010) Large High Speed Aluminum Vessels Design Guide and Training
Proposed Information Types / Sources • Materials / Alloys – raw material suppliers; alloy producers; material industry societies • Fabrication – extruding, casting, forming, machining facilities • Welding – aluminum welders; welding societies • Testing / Certification • Ship Designers / Ship Builders • Inspection / Classification Societies – ABS, Lloyd’s, USCG, DNV • Universities Large High Speed Aluminum Vessels Design Guide and Training
Task 3* *Per TI #2010-134 signed 30 Aug 2010 After having received and consider[ed] feedback from the project technical committee, develop a guidance manual to support the design of large high speed aluminum ships. The guide will provide information related to materials and welding, detailing, marine loads on high speed craft and how these influence fatigue, fracture and ultimate strength of hull structures. The subject matter will be described at three levels of detail (e.g. rules of thumb, closed form and numerical modeling). Design guide will be developed with several focus areas (next slide). Large High Speed Aluminum Vessels Design Guide and Training
Focus Areas Themes throughout Design Manual Materials Welding (preparation, filler, process, etc.) Structural Details High Speed Ship Loading Ultimate Strength of Hull Structure Fatigue Fracture Corrosion Large High Speed Aluminum Vessels Design Guide and Training
Task 4* *Per TI #2010-134 signed 30 Aug 2010 Provide the project technical committee with an early draft of the guidance manual for review and comment. Arrange and schedule a project review meeting to review the contents of report and comments from the technical committee. Deliverable: Early Draft Design Manual (submitted to TPOC, Monday, 28 March 2011) Meeting: Committee Comment Discussion Meeting – Tuesday, 26 April 2011, Gryphon (80 M St.) Large High Speed Aluminum Vessels Design Guide and Training
Task 5* *Per TI #2010-134 signed 30 Aug 2010 Deliver a draft and final version of the high speed aluminum ship design guide. Deliverable: Draft Design Manual (submitted to TPOC on Monday, 25 April 2011) Meeting: Committee Comments Discussion Meeting – Tuesday, 24 May 2011, Gryphon (80 M St.) Deliverable: Revised Design Manual (submitted to TPOC on Monday, 20 June 2011) Large High Speed Aluminum Vessels Design Guide and Training
Task 6* *Per TI #2010-134 signed 30 Aug 2010 Prepare a training course syllabus presenting the information contained in the high speed aluminum ship design guide. Deliverable: Draft Syllabus (submitted to TPOC Monday, 11 April 2011) Meeting: Committee Comments Discussion Meeting – Tuesday, 26 April 2011, Gryphon (80 M St.) Deliverable: Revised Syllabus (submitted to TPOC Monday, 09 May 2011) Large High Speed Aluminum Vessels Design Guide and Training
Task 7* *Per TI #2010-134 signed 30 Aug 2010 Arrange, schedule, and present a training course in the contractor’s facility. Approximately 40 students will attend the course, with 20 seats reserved at no cost to the Ship Structure Committee. The remaining seats will be used to support the cost of the course offering. Deliverable: Training Course Event – Thursday, 15 September 2011, Gryphon (80 M St.) Large High Speed Aluminum Vessels Design Guide and Training
Task 8* *Per TI #2010-134 signed 30 Aug 2010 Participate in a final project meeting to debrief and review the performance and quality of the project and deliverables. Modifications to the design guide will be reviewed in the meeting. Meeting: Final Project Committee Review Meeting – Friday, 16 September 2011, Gryphon (80 M St.) Large High Speed Aluminum Vessels Design Guide and Training
Resolution of the SOW Differences • SOW received from TPOC contains the following: • (3.1.1): “Industry input into the guide development shall be a priority.” (not included in signed TI) • (3.1.3): “The design guide shall consider operational loading with attention to localized pressure fluctuations, machinery to hull connection interface issues and shaft line / propeller loads of unique concern to high speed aluminum vessels.” (not included in signed TI) • Gryphon recognizes that industry input is important to the success of this task and that the loading types described in 3.1.3 are commonly associated with high speed aluminum vessels. Therefore, we recommend including industry input and design guidance concerning the loading described in 3.1.3. Large High Speed Aluminum Vessels Design Guide and Training
Resolution of the SOW Differences (cont’d) • SOW received from TPOC contains the following: • (3.1.5): “The design guide shall be in a format readily adaptable to adoption by a standards development organization. Adherence to the form and style standards from ASTM International’s ‘Blue Book’ is suggested. “ (not included in signed TI and differs from the next item) • (5.4): “The Contractor shall provide a print ready master final report and an electronic copy, including the above deliverables, formatted as per the SSC Report Style Manual.” (not included in signed TI and differs from previous item) • Gryphon recommends adherence to the SSC Report Style Manual for the Design Manual. Large High Speed Aluminum Vessels Design Guide and Training
Resolution of the SOW Differences (cont’d) • SOW received from TPOC contains the following: • (3.3): “It is expected that the proposed technical document, training course syllabus preparation and delivery could be completed in an 18 month time frame. The delivery of a course from the course materials prepared in this project would be completed after the completion of the first of the year of the [contract] (e.g. in months 14 to 18).” (differs from signed TI) • Gryphon notes the POP, as listed in the signed TI, is 12 months. Large High Speed Aluminum Vessels Design Guide and Training
Approach Literature and Industry Review of the State of the Art Outline Design Guide Write and Revise Design Guide Prepare and Conduct Training Course Large High Speed Aluminum Vessels Design Guide and Training
Description of Deliverables & Meeting Dates Kick-Off Meeting 9/22 Technical Committee Review Meeting 11/16 Project Status Meeting 2/1 Technical Committee Review Meeting 4/26 Technical Committee Review Meeting 5/24 Final Project Meeting 9/16 Task 1 Task 2 Task 4/6 Task 5 Task 8 Meetings Sept ‘10 Dec ‘10 Mar ‘11 Jun ‘11 Sept ‘11 Design Manual Draft Outline 11/1 Design Manual Outline 11/22 Design Manual Early Draft 3/28 Design Manual Draft 4/25 Design Manual 6/20 Design Manual Deliverables Training Syllabus Draft 4/11 Training Syllabus Final 5/09 Training Course Event 9/15 Task 2 Task 2 Task 4 Task 5 Task 5 Training Course Task 6 Task 6 Task 7 Large High Speed Aluminum Vessels Design Guide and Training
Discussion Identify TPOC – CDR Charles Rawson Refine focus areas Commercial and government organization POCs Review of action items and agreements Minutes of meeting to be prepared and distributed by COB Friday, 24 Sept 2010 Date of next meeting Large High Speed Aluminum Vessels Design Guide and Training
Contact Information • Bill Mish • Office: 202-621-1100 x 109 • Cell: 202-527-1859 • Email: WMish@GryphonLc.com • Tim Lynch • Office: 202-621-1100 x 112 • Cell: 202-527-5169 • Email: Tlynch@GryphonLc.com Large High Speed Aluminum Vessels Design Guide and Training