70 likes | 216 Views
Peter Godfrey Network Strategy Manager NS North. M606 – M62 HOV GATE. M606 – M62 HOV GATE. Pilot Study Area. M606 – M62 HOV GATE. Initial HOV Scheme. M606 – M62 HOV GATE. Final HOV Scheme (1). M606 – M62 HOV GATE. Final HOV Gate Scheme (2). M606 – M62 HOV GATE. Scheme Benefits.
E N D
Peter Godfrey Network Strategy Manager NS North M606 – M62 HOV GATE
M606 – M62 HOV GATE Pilot Study Area
M606 – M62 HOV GATE Initial HOV Scheme
M606 – M62 HOV GATE Final HOV Scheme (1)
M606 – M62 HOV GATE Final HOV Gate Scheme (2)
M606 – M62 HOV GATE Scheme Benefits The M606 – M62 HOV gate scheme is expected to deliver benefits, these include: • Drivers in car share vehicles will be able to gain priority access, bypassing congestion. • Car share vehicles would save on average 8 minutes during the peak periods on this section of road. • Environmental benefits as drivers share their cars with others.
M606 – M62 HOV GATE Scheme Visualisation Visually demonstrates the operation of M62 J26 with and without the proposed HOV gate during peak periods.