1 / 13

Knowledge Management KPE Operations Department

Knowledge Management KPE Operations Department. Introduction Kuwait Petroleum Europoort B.V. Start situation Experience with Elsevier opleiding & advies (Eo&a) during a construction project Development of a plan / goal Plan realisation Example Sulphur Plant Experiences

mervin
Download Presentation

Knowledge Management KPE Operations Department

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Knowledge Management KPE Operations Department • Introduction Kuwait Petroleum Europoort B.V. • Start situation • Experience with Elsevier opleiding & advies (Eo&a) during a construction project • Development of a plan / goal • Plan realisation • Example Sulphur Plant • Experiences • Control, updating and ownership of procedures

  2. Introduction Kuwait Petroleum Europoort ( KPE ) B.V. • Fuels, Lube Base Oils , Bitumen • Original owner Gulf Oil Corporation ( 1963 ) • Taken over by Kuwait Petroleum Corp. 1983 • 1986 : Modernisation Lube Oil Plant • 1987 : Upgrade tankfarm ( VLPC project ) • 1990 : New Gasoline Plant ( lead/sulphur free ) • 1994 : Diesel S-content < 350 ppm • 2001 : Diesel S-content < 50 ppm • 2004 : Diesel S-content < 10 ppm

  3. Introduction Kuwait Petroleum Europoort ( KPE ) B.V. • 2 Crude units ( 4 mm t/yr ) • Conversion:ThermalCracker/ Visbreaker( 0.5 mm t/yr ) • Gasoline Plant ( 0.9 mm t/yr ) • Diesel ( < 10 ppm S ; 1 mm t/yr ) • Jet Fuel ( 0.5 mm t/yr ) • 8 Base Oil Grades ( 0.25 mm t/yr ) • Bitumen ( 0.35 mm t/yr )

  4. Introduction Kuwait Petroleum Europoort ( KPE ) B.V. • Distribution Centre • 7-8 Million tons per year • 25 VLCC’s/VLPC’s • 120 Coasters • 6000 Barges • 8000 Trucks • 110 Tanks ; 2 Million M3

  5. Introduction Kuwait Petroleum Europoort ( KPE ) B.V. • Organisation • 325 Employees • Operations : 185 • Engineering & Maintenance : 85 • Finance, Human Resources , Logistics • Operations • 170 Shift personnel • 15 Day personnel • Manager Operations : Rob van der Velden

  6. Start situation • Knowledge fragmented in the heads of experienced employees • Production process described in original design manuals ; operational procedures general and not up to date • Foreseen rejuvenation of the operator staffing

  7. Experience with Eo&a during a construction project • Gasoline Plant • Favorable experience with Eo&a’s Knowledge Systems department • Gasoline plant manuals served as a pilot • Combination of practical experience of KPE operators and Eo&a expertise • Complete set of detailed process descriptions and extensive operational procedures ( normal, start-up, shut-down, emergency )

  8. Development of a Plan / Goal • Complete detailed process- and procedure manuals for all first line production processes based on Gasoline plant system • Quicker and more effective training of new employees • Establish uniform operating practices across the various production plants

  9. Plan realisation • Eo&a team on the refinery • 3-4 Operators full time • Structure via Top Down method • Overview total process • Detailed drawings for each paragraph • User friendly • Quick access to required information • Only relevant information • Structure according to sequential phases of production process

  10. Sulphur Plant Example • Process Description • General ( approval,legend,symbols ) • Plant ( plot plan, theory, equipment ) • Storage and Utilities • Normal Operation • General , Plant , Storage and Utilities • Procedures • General • Start-up • Special • Shutdown • Emergency

  11. Experiences • Outsourcing • Other priorities , workload own force • Specialism • High quality end product • Involvement own employees increases basis ; acceptation • Uniform training requirements; operator exams • Direct availability ; no fragmentation • More effective training new employees • Less mistakes ; quicker start-ups ( less shift change delays ) • Requirement for ISO certification ; demonstration of good control of production process • Knowledge drain avoided

  12. Control,Updating,Ownership • Each manual has owner • No modifications allowed without authorization Operations and Technology Section Heads • Scheme for periodic updates • Electronic availability ( Intranet ) • Limited number of hard copies • One overall administrator for all manuals • ( intranet + hard copies ) • System to make sure that operators are being trained in modifications

  13. More information • Hand out presentation at Eo&a’s information stand • Possibility to view the complete Sulphur Plant manual • Questions?