Update on H/Abb -> 4b’s process (4jet Trigger)

Update on H/Abb -> 4b’s process (4jet Trigger). Kohei Yorita Young-Kee Kim University of Chicago @ the FTK Meeting on Sep. 7 th , 2006. Review (What’s been done so far).

mervin
Download Presentation

Update on H/Abb -> 4b’s process (4jet Trigger)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on H/Abb -> 4b’s process (4jet Trigger) Kohei Yorita Young-Kee Kim University of Chicago @ the FTK Meeting on Sep. 7th, 2006

  2. Review (What’s been done so far) TDR-style-analysis, i.e. Based on Atlfast jet and Used single threshold. This improvement is given by lowering 4J threshold from ~60-70 GeV to 40 GeV where LVL1 output rate is 1KHz. (TDR (~200Hz) @ ~60 GeV) But LVL2 out can be ~100Hz by FTK btagging.

  3. Multi-Threshold Scan (Atlfast basis) Each point was selected when trigger rate became closest to 1KHz in each case. Keeping 1KHz by increasing 1st (~80 GeV), 2nd (60-70 GeV), and 3rd (40-50) jet Pt but by lowering 4th jet Pt (20 , 30 GeV), Signal (M_A = 500 GeV) acceptance increases by a factor of 1.5~2 !!!

  4. Trigger Rate Calculations with New Samples and LVL1 Parameterization Note : Lum = “2”x1033 Looks very close to Erik’s Numbers (Note luminosity) Given the assumption that LVL1 output max is 1KHz, we can lower the threshold to ~20GeV(8x8 calo.) from 40 GeV(8x8 calo.).

  5. Some issues : Old vs New Sherpa Samples Note : Lum = “2”x1033 All new sherpa samples give lower rate than old 2->2+3, yt>25 sample Which was used as a default so far. Old : 1KHz @ 40 GeV New : 1KHz @ 30 GeV. If this is “expected” feature and Not due to bugs, We will have to redo sensitivity study By lowering 4th jet pt to 30 GeV, not 40 GeV

  6. > Things to do : (To Finalize) - Multi-Threshold Study by using “LVL1 Parameterization”. - In progress now. - Good to try to measure dijet (H/A) mass. - Systematics ? - Final Check with other generator & setting. - Documentation … -- Being Prepared ! - Any other issues ?