Management System of Waste Electrical and Electronic Equipment (WEEE) in Ukraine

This report provides an update on the activities and outputs achieved during the fourth quarter of the Twinning Project in Ukraine, aimed at implementing a management system for WEEE. It includes details of coordination, expert missions, study visits, and the development of strategies and legislation.

merz
Download Presentation

Management System of Waste Electrical and Electronic Equipment (WEEE) in Ukraine

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Twinning ProjectINTRODUCTION OF A MANAGEMENT SYSTEM OF WASTE ELECTRICAL AND ELECTRONIC EQUIPMENT (WEEE) IN UKRAINE ACTIVITIES AND OUTPUTS ACHIEVED DURING Q4 FOURTH STEERING COMMITTEE MEETING 21 February 2017, Kiev, Ukraine Reporting period: 1 November 2016– 31 January 2017 This project is funded by the European Union

  2. Presentation’s structure • I- Twinning activities during the fourth quarter • Q&A • II- Planned activities for the fifth quarter • Q&A • Conclusion

  3. COMPONENT 0 PROJECT STEERING AND VISIBILITY Activity 0.2: Project Co-ordination, Reporting and Steering Committee Meetings - 8 working days • Coordination of the activities planned for the Fourth Quarter of November 2016-January 2017 • Adoption of the Plan for Project outputs • Planning of the expert missions for the Fourth Quarter • Agreement on the Twinning project activities during the next Quarter

  4. Activities during Quarter Four Activity 1.2: Reinforcing the institutional capacity of the authorities responsible to bring the national legislation on wastes closer to the EU Acquis 25 working days Activity 1.3. Study Visit to Spain 21-25 November 2016 Activity 2.2. Defining WEEE and batteries collection targets 10 working days Activity 2.3. Identifying the optimal technical and associated financial schemes to be introduced in Ukraine 2,5 working days Activity 2.4. Designing a strategy for gradual introduction of WEEE and used batteries scheme 10 working days Activity 3.2. Defining WEEE and batteries collection targets 8 working days

  5. COMPONENT 1: CONSOLIDATION OF THE RELEVANT STAKEHOLDERS Activity 1.3. Study Visit to Spain 21-25 November 2016 • Acquaintance with the Spanish management system for WEEE and batteries and ways of establishing the similar system in Ukraine • Information on PROs activities in Spain: how it works, sensitization campaigns they conduct etc., the role of the state in waste regulation, permitting system, registers, reporting and controlling of PROs • Visit to municipal collection points, stationary and mobile collection points, information on their organization, maintenance etc. Institutions visited during the Study Visit: • RECYBÉRICA AMBIENTAL, S.L. - WEEEs treatment plant and batteries sorting; • RECYCLIA (Ecopilas, Ecofimática, Ecoasimelec and Tragamóvil) - Integrated Management Systems for WEEE; • RECYTECH IBERIA - WEEEs treatment plant; • GENERALITAT VALENCIANA - CONSELLERIA DE AGRICULTURA, MEDIO AMBIENTE, CAMBIO CLIMÁTICO Y CALIDAD AMBIENTAL; • CONSORCI RIBERA I VALLDIGNA (RECICLADOS RIBERA DEL XÚQUER) – Ecoparques.

  6. Activity 1.3. Study Visit to Spain(21-25 November 2016)

  7. Activities and results • Exploring the Austrian, French, Spanish and Italian WEEE management systems and best practices • Development of WEEE and WBA management functioning models, collection and treatment options • Presentation of the Functional Model for waste management on WEEE and Batteries on 20th of December 2016 for public consideration with the participation of Vice Prime Minister- Minister of Regional Development and Deputy Minister of Regional Development • Development of WEEE and WBA parts in integrated Waste Management Strategy of Ukraine according to the Ukrainian administrative framework • Participation in different meetings and public hearings on the Strategy • Working on draft legislation on waste batteries and accumulators and WEEE

  8. ACTIVITIES AND RESULTS • Documents on WEEE organizations, WEEE treatment process, WEEE collection, role of the Clearing House, WEEELabex, Rep Tool presented and explained to the Beneficiary • Adaptation of the electronic tool for Ukraine to calculate the annual amounts of WEEE generated based on the amount of EEE placed on market and corresponding product lifespan Assessment of the possibilities for information system on WEEE and batteries • Prerequisites for establishment of waste management information system in Ukraine Structure of the information system: • Functional Structure • Internet application with authorized access to the data • Administration of waste management system

  9. AMENDMENT TO THE WORK PLAN Assessment of the possibilities for information system on WEEE and batteries • Activity 1.2. 2.2, Class 2 (Austrian Standards) and Class 2 (EAK-AT) • Activity 3.1 - Waste prevention and pro-active sensitization campaigns on sound waste management • Activity 3.2 - Developing a website dedicated to sound waste management • Activity 3.3 - Identifying needs for curricula on waste governance

  10. Part II, planned activities • II- Planned activities for the fifth quarter • Q&A • Conclusion

  11. Planned missions in Ukraine 30 January – 04 February 2017 Erwann Fangeat – Draft Laws on WEEE and Batteries 05 -11 February 2017 Rachel Baudry - Draft Law on WEEE and Batteries 11-20 February 2017 Elisabeth Poncelet - Draft Law on WEEE and Batteries 13-18 February 2017 Francois Touchais- Draft Law on WEEE and Batteries 8-10 March 2017 Study Visit to Austria 20-24 March 2017/Alternatively 27 March 3 April- Information system 10 – 14 April 2017 STEs from Spain PROs and IPRs functioning 24-28 April 2017 STEs from Spain

  12. This project is funded by the European Union Thank you for your attention Johannes Mayer Elina Velinova Stoyanova-Lazarova Eva Fornes Maksym Barinov