160 likes | 471 Views
A planned residential community Approved Vesting Tentative Map LOM 533. River Terrace. The romance and elegance of a Tuscan Village. By C oastal V ision. Site Location. 26 acres At the Main Entry to Lompoc. 2 blocks from PCH and Hwy 246. Adjacent to Santa Ynez River.
E N D
A planned residential community Approved Vesting Tentative Map LOM 533 River Terrace The romance and elegance of a Tuscan Village ByCoastal Vision
Site Location 26 acres At the Main Entry to Lompoc. 2 blocks from PCH and Hwy 246. Adjacent to Santa Ynez River. 2 blocks from new Hospital, now under construction.
A planned residential community River Terrace Mixed use / Smart Growth Infill Project Tuscan Village Design Neighborhood Commercial Abundant Recreational Opportunities 15% Affordable 52% Open Space
Recreational Elements • Recreational Center • 2 Pools • Barbeque areas • Fitness Center • Child Day Care Center • Recreation Rooms • 3 acre Park • Tot Lots • 1 acre Village Garden • Class 1 Bike Trail • Pedestrian Paths • Commercial Plaza Managed by HOA
Community Center • 9,110 sq.ft • Lounge with Fireplace • Fitness Center • Swimming & Wading pools • Recreation Rooms • HOA Office • Day Care Center
62 Single Family Detached 308 Residential Units 65 Town Homes 181 Condominiums
Single Family Detached Homes Tuscan Design Modern Floor Plans
65 Townhomes 3 Story Mix of 2 & 3 Bedrooms 2 ½ to 3 ½ Baths 1,050 to 1,682 Sq.Ft Enclosed Parking Plus Ample Guest Parking
2 Bedroom 3 Story Town House Units 3 Bedroom 2 Story 2 Bedroom 2 Story
Town Home Elevations • 4 buildings • Each Unit will have unique color and detail
181 Condominiums • 2 & 3 Story Buildings • 1 to 3 Bedroom • 1 to 3 Bathroom • 700 to 1,617 sq.ft. 2 Parking Spaces each plus Guest Spaces
Three Story Building with Central Elevators Condominium Elevations Two Story Court Yard Building
3 Bedroom Typical Floor Plans 2 Bedroom 1 Bedroom
Small Shops and Office Space • Open Courtyard • Outdoor Seating • Tree Lined Plaza
Current Status • Grading Plans are approved and ready for bonding • The second set of corrections for the First Phase Improvement plans have just been received and are being implemented. • Grading can start now, once bonds are posted.