1 / 4

A couple more updates 26 Feb 2008

A couple more updates 26 Feb 2008. Updates:. Disassembled HBD East Identical pock marks on top GEMs, discarded Working on washing all copper GEMs 20 test stacks finished with pre-CsI measurements New Help! Vlad Pantuyev and Bhartendu Singh. Drift Field. FB: Clear peak with gain ~13000.

Download Presentation

A couple more updates 26 Feb 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A couple more updates26 Feb 2008

  2. Updates: • Disassembled HBD East • Identical pock marks on top GEMs, discarded • Working on washing all copper GEMs • 20 test stacks finished with pre-CsI measurements • New Help! • Vlad Pantuyev and Bhartendu Singh

  3. Drift Field FB: Clear peak with gain ~13000 Zero: Clear peak with gain ~11500 RB: No clear peak! Structure is result of LLD on scope

  4. Scintillation cube • New and improved cube is finished with machining (right Craig?) • SB is ready for aluminum and MgF2 evaporation • Real vacuum feedthrough is being assembled in SB machine shop

More Related