1 / 5

Dynamic modeling in a representative watershed (Guadalupe)

San Francisco Estuary Institute. Item #3f. Dynamic modeling in a representative watershed (Guadalupe). Michelle Lent, John Oram, and Lester McKee Sources Pathways and Loadings Workgroup May 6 th 2010. San Francisco Estuary Institute. Item #3f. Status update.

Download Presentation

Dynamic modeling in a representative watershed (Guadalupe)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. San Francisco Estuary Institute Item #3f Dynamic modeling in a representative watershed (Guadalupe) Michelle Lent, John Oram, and Lester McKee Sources Pathways and Loadings Workgroup May 6th 2010

  2. San Francisco Estuary Institute Item #3f Status update • Project put on hold in Sept. 2009 to leverage results of other studies, e.g. WY 2010 monitoring in Guadalupe • TRC approved carrier-over funds for 2010 • Project to resume shortly • Current status: • Fully calibrated and validated hydrology model • Partially calibrated sediment model • Data partially collated for pollutant (Hg & PCB) model

  3. San Francisco Estuary Institute Item #3f Phase 2 (sediment, Hg & PCBs model) timeline

  4. San Francisco Estuary Institute Item #3f Proposed Phase 3 - model improvements & usage • Extend model timeframe to include WY2008-2010 • Allows for further Hg & PCBs calibration to Guadalupe River sampling data collected in recent years • WY 2010 hydrology and rainfall will be preliminary data from USGS and Water District • Split lumped treatment of PCBs into the nine homologue groups • Model land management scenarios • Investigate impacts of land-use change and LID/BMP implementation scenarios of value to WG • Although not a focus of this group – we could also explore climate change scenarios

  5. San Francisco Estuary Institute Item #3f Proposed Phase 3 budget options

More Related