An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inner detector upgrade / IBL Activities on cooling circuits @ LAPP LAPP team Jacky Ballansat, Patrick Baudin, Pierre-Yves David, Pierre Delebecque, Sabine Elles, Mohamed El Kacimi, Nicolas Massol, Thibaut Rambure, Jean Tassan, Theodore Todorov, TamerYildizkaya

  2. 1 – IBL Cooling lines Layout pp1-pp0 INLET OUTLET Manifold connexion LAPP Fitting 1.7mm LAPP Fitting 2.2mm Ceramic PP0 brazed sleeve Beam Pipe Stave Ti ID 2.0-OD2.2 Ti ID 1.5-OD1.7 SS ID 2.0-OD3.0 SS ID 1.5-OD2.5 IST

  3. Specifications 2 –Fittings • Small fitting, less than 10 mm : • To minimize budget material • To fit inside a limited volume • Maximum leak rate (He) : 10-8 mbar.l.s-1 @ 20bar • Pressure (bar): • Radiation level : up to 1000 Mrad • Working temperature : mini -40 °C  maxi +20 °C • Pipes dimensions : • Typical type I tubes : 1.5 and 2 mm ID, 0.1mm wall thickness • Pipe material : Titanium T40 3

  4. Context 2 –Fittings • Current developments based on IBL context (but upgrade is the next step) • Fittings will be used @ PP1 (end of IST) • Developments for Upgrade …and other experiments 4

  5. 3 –Fittings Fittings evolution summary 5

  6. 3 –Fittings Fittings evolution summary (Baseline) • Material • Titanium grade 2 and 4 : hardness to low • Titanium grade 5 (TA6V) : same hardness as Stainless steel use for commercial fittings • Shape • Cone/cone : “random” results • Cone/toroid : good results but design sensitive to misalignment • Cone/sphere • Gliding surface treatment • PVD carbon tungsten : good to prevent “metal chips” (good hard wearing) • Graphite : should be as good as MOS2 but same results as “no treatment” ??? • MOS2 ( special attention to prevent treatment migration on cone and sphere) • Leak tightness surfaces • Cone raw from machining / sphere polished 6

  7. Tests - prototypes 2 –Fittings • Prototypes “base line type” manufactured and tested • 16 prototypes made @ LAPP • 50 prototypes made in the industry • Tests motivations • Comparison between LAPP and industrial production (similar results) • Influence of the polishing • Comparison MOS2, graphite, PVD (tests on fittings + specific tests) • Influence of the heating on material characteristics ( conclusion= decreasing of the hardness !! -> no brazing !!! (for Titanium and stainless steel) • Prototypes on other devices • Stainless steel on cooling loop prototypes • TA6V on first IBL stave 0 • Other developments • Special tooling to prevent rotation and to apply the required torque : first prototypes 7

  8. Leak tightness studies 2 –Fittings • Issue • Connection between samples and test device seemed not as good as the fitting itself • Difficulties to validate the samples if there were other leaks • No problems @ room temperature but leaks appeared @ -40 °C (He 20 bars) • Actions • He test of the vacuum seals (room temperature and cold) : seemed OK • Different type of materials for seals and flanges and shapes (and glues) have been tested • Take into account the expansion coefficients of the materials • Performed simulations • Conclusion • Leaks appear on elastomer vaccum seals @ a precise (cold) temperature. • Elastomer seal replaced by an helicoflex (aluminium + spring) • Hoped the problem would have been solved sooner • Better sample/flange connexion • New titanium seal developed • Needs “high torque level (30 N.m) 8

  9. Leak tightness studies 2 –Fittings New Sample flange assembly 9

  10. CO2 cooling tests 2 –Fittings • Tests of proto stave have been performed @ LAPP • Up to 50 temperature (-40 to +50 °C) and pressure cycles (5 to 60 bars) • LAPP fittings (10 mm) + swagelok mounted on the stave • 150 bars hydraulic pressure test 10

  11. Next steps 2 –Fittings • New tests • Last tests to be done on 18  10mm fittings • Leak tests on new  8mm fitting (1st standard test OK (1.510-8mbar.l.s-1 @ 20bar @ -50 °C) • Developments • Tightening tool:  8mm design 11

  12. 3 –EB welding • 4x10 samples welded • Good general results, no leak @ 1bar He (Techmeta) • Small amount of material inside the pipe • More metallographic analysis results from CERN in the future • Leak test :1ststandard test OK (1.810-8mbar.l.s-1 @ 20bar @ -50 °C) Metallographic analysis from Techmeta ( 1.5mm and 2 mm ID pipes)

  13. 4 –Electrical break • Baseline solution : electrical break independent from the fitting • Placed on the “dismountable” side • Stainless steel pipe EB welded on a “kovar” cover • Titanium pipe EB welded on a titanium cover • Ceramic brazed on the 2 covers • Material used for brazing can contain silver • Covers have to be machined to produce prototypes Stainless steel pipe Ceramic Titanium cover kovar cover Titanium pipe • Alternative solution : electrical break included in the fitting • One part of the fitting is made of ceramic (male or female) or both • The ceramic is placed on the dismountable side • More compact than the baseline solution • First tests : no good results -> elements back to the manufacturer for polishing • Improvement: titanium coating on the contact surfaces. 13

  14. CETIM audit 5 –Quality • Goals • Made by leak tightness and industrial developments experts • Survey of the design, the tests and prototypes, the methodology, the QA • Last step before production • First main recommendations • Improve the qualification of the test devices • Be more rigorous to analyse the “untypical” results • Check if a fitting machined at the limit of the tolerances fit the specifications • Perform geometrical and dimensional measurements • Better define the risks of pollution and damage • Better define the backup solutions in the case of trouble (risk analysis) • Work on the production procedure and be sure the sensible parameters are recorded • Next action • Production quality management : need a new contract and €€ 14

  15. Summary •  10mm Fittings seem OK •  8mm Fittings have to be validated • EB welding : last tests to perform but we are confident • Electrical break : Base line solution to be tested – integrated solution seems more tricky • Cooling lines production : preparation in work / help of CETIM to manage the quality 15