An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLDS Grant Project State longitudinal Data Systems (SLDS)

  2. SLDS Grant Award • US Department of Education • Federal Grant, $13.8 Million, three year grant - July 1, 2010 – June 30, 2013 • Grant funding provided by American Recovery and Reinvestment Act (ARRA), through the US Department of Education and the Institute of Education Sciences • Project Goal • Enhance Wisconsin’s ability to exchange student level data between K-12 public and post-secondary educational institutions.

  3. Participants in SLDS Grant • Wisconsin Department of Public Instruction is the administrator of the SLDS grant and provides reporting to the federal government for each sub-grant in the overall SLDS project • Grant is sub-granted among the three, post secondary participants • UW System – University of Wisconsin Schools • WAICU - Wisconsin Association of Independent Colleges and Universities • WTCS – Wisconsin Technical College System • Each participant wrote a grant application to participate

  4. Goals of SLDS Project • Accelerate data sharing and interoperability among state education agencies utilizing Wisconsin Student Number (WSN) • Create mapping of common data definitions between the participants in the SLDS project • Support AdHoc research requests from K-12 through post secondary without exposing student demographics and maintain compliance with Family Educational Rights and Privacy Act (FERPA) • Develop documentation , policies and procedures to inform and coordinate the data exchange between educational partners to ensure secure transfer

  5. WTCS SLDS Project • WTCS applied for SDLS grant to: • Allow for the inclusion of WSN into WTCS data systems. • Modernize data architecture and reporting systems used at WTCS • Improve reporting capabilities • WTCS grant application was approved • Funding approved for WTCS project = $2.2 Million • Duration of Project- July 1, 2010 – June 30, 2013

  6. Goals of WTCS SLDS Project • Consolidate redundant systems and data • Eliminate antiquated architecture and report generation systems • Develop data systems that support a single authoritative source for WTCS reporting data • Improve security • Enable granular control of data access through the use of security groups • Require access approval from designated Data Access Coordinators appointed by each District • Enhance reporting capabilities • Enable use of WSN and matching techniques to identify clients between systems

  7. Goals of WTCS SLDS Project • Consolidate Redundant systems • Eliminate Multiple data storage methods • SQL server databases (about 40 databases) • SAS datasets (about 1100 data sets since 1994) • Consolidate data to single set of three databases • Ease development of new reports • Provide for archival of historic data • Use a high performance database engine instead of SAS datasets • Consolidate data processing • Consolidate preprocessing edits (over 300 edits currently identified) • Consolidate data feeds from multiple sources (DWD, National Clearinghouse, DPI) into a staging database for processing into data warehouse. • Multiple reporting systems and data storage methods currently employed • Text based reports – generated with SAS Business Analytics • XLS based reports – SQL server, Visual Basic Scripting, and Excel • Scorecard/QRPDS – Cognos Business Intelligence System

  8. Goals of WTCS SLDS Project • Improve Security of systems and data • Use active directory groups and login accounts to manage access to systems and to data presented in reports • Move to granular permissions rather than all or none • Streamline process for gaining access and create policy for revoking access • Encrypt WSN and SSN fields within existing data as it is loaded to the warehouse • Eliminate presentation of any unique student identifying information from any report or view of the data • Conform to FERPA rules on sharing data between partners • Move detailed system documentation within non-public web site.

  9. Goals of WTCS SLDS Project • Enhance Reporting Capabilities • Enable exchange of client data or report data based on WSN number • Transition to web based reports that can be downloaded in a variety of different formats • Consolidate the number of reports generated • Document report and user requirements • Identify and eliminated unused reports • Identify reports that no longer provide coverage across all districts(not all districts delivering data to report against) • Determine move forward strategy for reporting structure • Implement retention policies for both data and any specific reports generated for historical snapshots.

  10. What can you expect as users? • Existing reporting systems will remain in place throughout project • Will be used as reference once new data warehouse and report generation systems are in place • New web based reports with options for downloading to PDF, TXT or XLS formats • Reports with “Drill Down” capabilities • Change in logon process • Change in what is displayed to authenticated users • A new data upload web page • Online data loading and editing client data for CBO’s • More flexible data and reporting structure

  11. Current Activity and Accomplishments • Implemented new CBO’s data entry process • Currently developing new upload process • Restructuring and movement data into the data warehouse • Grants database – complete • Client data – in progress (Est. May 31st) • Course and Curriculum (Est. June 31st) • Other system through end of year • Currently working with Course and Curriculum data and applications

  12. Proposed Timeline for Project

  13. Questions?

  14. Links to DPI LDS project information • DPI SLDS Grant Web Site • http://dpi.wi.gov/lds/wildsgrant3.html • Includes detailed information about all the efforts under way for the SLDS project across all educational institutions within Wisconsin. • DPI SLDS Grant Application III (109 pages) • http://dpi.wi.gov/lds/pdf/lds-2009ARRA-grant-app.pdf • DPI LDS Project Website • http://dpi.wi.gov/lds/projects.html