1 / 20

INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT

INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT. Naba K Mondal Tata Institute of Fundamental Research Mumbai, India. NUFACT Scoping Study Meeting at CERN, 22-24 September, 2005. India-based Neutrino Observatory initiative.

mickey
Download Presentation

INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at CERN, 22-24 September, 2005

  2. India-based Neutrino Observatory initiative Goal: A large mass detector with charge identification capability • Two phase approach: • R & D and Construction • Phase I • Physics studies, • Detector R & D, • Site survey, • Human resource development • Phase II • Construction of the detector Operation of the Detector Phase I Physics with Atmospheric Neutrinos Phase II Physics with Neutrino beam from a factory NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  3. Physics using atmospheric neutrinos during Phase I • Reconfirm atmospheric neutrino oscillation • Improved measurement of oscillation parameters • Search for potential matter effect in neutrino oscillation • Determining the sign of Dm223 using matter effect • Discrimination between nm nt and nm  ns oscillation • Probing CP and CPT violation • Constraining long range leptonic forces • Ultra high energy neutrinos and muons NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  4. Physics with Neutrino beam from NUFACT – Phase II • Determination of q13 • Sign of Dm223 • Probing CP violation in leptonic sector • Matter effect in nm ntoscillation NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  5. Role of Phase I as a test detector for the factory era • Currently we only have experience of running magnetised iron detector of upto 5 kton. No experience of running a large mass magnetised detector. • So during phase I of the operation of the INO detector while we do interesting physics using atmospheric neutrinos, it can also be used as a test detector for the factory era and to improve upon it . • The modular nature of this detector can even allow us to try out more than one options for the active elements like RPC, scintillators … • While we have a supporting funding agency in India we need international support and collaboration to achieve this. NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  6. N up(L/E) N down(L’/E) = P(nm nm; L/E) Disappearance of Vs. L/E The disappearance probability can be measured with a single detector and two equal sources: = 1 - sin2 (2Q) sin2 (1.27 Dm2L/E) NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  7. Matter Effect & Sign of D31 from event rate m- m+ NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  8. Sign of Dm232 frommatter induced asymmetry d32 > 0 d32 < 0 The neutrino and anti-neutrino up/down event ratios are different from each other as well as different with direct and inverted mass hierarchies. Q13 = 5,7,9,11 NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  9. nm nt vs nm ns nmnt events will give rise to excess of muon less events. There will be excess of upgoing muonless events. NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  10. Choice of Neutrino Source and Detector • Neutrino Source • Need to cover a large L/E range • Large L range • Large En Range • Use Atmospheric neutrinos as source • Detector Choice • Should have large target mass ( 50-100 kT) • Good tracking and Energy resolution ( tracking calorimeter) • Good directionality ( <= 1 nsec time resolution ) • Charge identification • Ease of construction • Modularity • Complimentarity with other existing and proposed detectors • Use magnetised iron as target mass and RPC as active detector medium NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  11. INO Detector Concept NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  12. The Magnet NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  13. RPC Efficiencies and Timing RPC working in Streamer mode NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  14. RPC R & D CMS bakelite RPC 73 cm X 42.5 cm 120 cm X 90 cm Glass RPC Built at TIFR CMS RPC on test stand NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  15. Detector Simulation • Used NUANCE Neutrino Event Generator • Generate atmospheric neutrino events inside INO detector • Used Atmospheric Neutrino Flux of Honda et. al. • GEANT detector simulation package • Simulate the detector response for the neutrino event • Generated 5 years of simulated data equivalent to 5 years of running the experiment. • Analysed oscillation data at two levels • Using NUANCE output and kinematic resolution function • Using full detector simulation • Obtained preliminary results so far. Detailed simulation is underway. NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  16. LOCATION OF INO • PUSHEP (Pykara Ultimate Stage Hydro Electric Project) in South India NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  17. PUSHEP NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  18. Underground Cavern Experimental Hall Layout of the Underground Cavern Size of the experimental hall 150 m X 22 m X 30 m Parking & Storage Access tunnel Experimental Hall Electronics NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  19. Status of the Proposal • Some R & D fund was made available. • Several institutes from India are currently involved in various INO related activities. • Underground Site has been chosen. • A presentation to the funding authorities was made on 1st May 2005. • A second presentation was made on 28th of August, 2005 to the Scientific Advisory Committee to the Indian Prime Minister (SAC-PM). Response of the committee is very positive. • We are in touch with the global neutrino community for support and participation. NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

  20. Summary • A large magnetised detector of 50-100 kton is needed to achieve some of the very exciting physics goals using atmospheric neutrinos. • A case for such a detector was highlighted earlier by the Monolith Collaboration. • Physics case for such a detector is strong as evident from recent publications. • It will complement the existing and planned water cherenkov detectors. • Can be used as a far detector during neutrino factory era. • We have started a very active R & D work towards building such a detector. • Apart from the physics using atmospheric neutrinos, this detector can act as the R & D center for a magnetised iron detector during factory era. NUFACT Scoping Study meeting at CERN, 22-24 Sep, 2005

More Related