Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) ‏

Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) ‏. 731 000 inhabitants 43 inhab / km² 39% population is rural. Axis 5 Strategic objectives. To reduce the negative impact of borders on economic development and EU territorial integration

miette
Download Presentation

Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) ‏

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cooperation in the mainstream programmes / article 37-6bexample of Limousin (France)‏ • 731 000 inhabitants • 43 inhab / km² • 39% population is rural

  2. Axis 5Strategic objectives • To reduce the negative impact of borders on economic development and EU territorial integration • To improve theefficiency of policies and tools dedicated to competitiveness and cohesion • To identifyinnovative solutions to similar problems for which a regional or national approach is not relevant • To valorize Limousin’s potential and know-how and to reinforce its positive image

  3. Axis 5Specific objectives • To disseminate the added value of previous interregional cooperation experiences • To stimulate, facilitate and simplify the access to interregional cooperation • To develop transnational partnerships able to apply for targeted European programmes (FP7, CIP, Youth…) • To promote interregional cooperation for the benefit of local stakeholders

  4. Strategic orientations of OP ERDF in Limousin • Axis 1 = Reinforcing the potential of research, training, innovation & technologies transfers • Axis 2 = Developing the competitiveness, entrepreneurship and employment • Axis 3 = Reinforcing the capacity of territories to attract and welcome new populations • Axis 4 = Valorising the quality of environment and ensuring sustainable development • Axis 5 = Facilitating partnerships of international and interregional cooperation

  5. Total Expenditures ERDFamount ERDFfunding rate Axis 1 111 711 111 € 30 300 000 € 27 % Axis 2 201 259 820 € 35 000 000 € 17 % Axis 3 172 500 000 € 38 000 000 € 22 % Axis 4 65 400 000 € 16 340 000 € 25 % Axis 5 10 000 000 € 4 000 000 € 40 % Technical assistance 6 031 892 € 3 619 135 € 60 % Total 566 902 823 € 127 259 135 € 22 % Budget allocationof OP ERDF in Limousin

  6. Axis 5Types of operation • Networks = exchange and dissemination of informations between partners interested in a project => new knowledge and innovative methods • Pilot projects = exchange and transfer of good practices, concentrating on a specific thematic of cooperation => new types of actions • Regional frame operation = capitalisation of good practices within a strategic and operational framework => methodology and tools for transfer _ + Intensity of cooperation

  7. Axis 5Coherence and synergies Measure 1 1 million € ERDF Regional frame operation Measure 22 millions € ERDF Pilot projects Measure 31 million € ERDF Networks Local initiatives of bilateral cooperation

  8. Axis 5Indicators for evaluation Quantitative objectives / expected results in 2013 • Regional frame operation = 1 • Networks = 10 • Pilot projects = 40

  9. Axis 5 – Measure 1“Regional frame operation” • BeneficiariesRegional authorities (NUTS II)‏ • Types of actionsElaboration of a « resources center » for the capitalization of regional & transferable good practices • Types of expendituresTravelling costs, personnel costs for management and coordination, logistical costs for organizing seminars, trainings and conferences, studies, translation and communication costs • Eligibility conditionsThematic coherence with regional strategy focusing on rural development and territorial cohesionMininum 5 partners involved from 3 member states • Funding conditionsMaximum public funding rate = 100%Maximum ERDF rate = 75%Minimum ERDF amount = 500 000 € CAPITALIZATION

  10. Axis 5 – Measure 1“Regional frame operation” RUR@CT network • Strategic objectives = « rural lobbying » • Operational objectives = transfer of experiences • 62 Regions in 17 Member states • 92 operational contacts • 1 methodological guide for the transfer • 1 web site & 1 database • 125 good practices / transferability evaluation • 82 transfer opportunities between partners • 10 ongoing transfers in Limousin

  11. RUR@CT implementationArticle 37-6b as possible funding PREPARATION OF THE TRANSFER(Animation, engineering)‏ IMPLEMENTATION OF THE TRANSFER(Pilot project)‏ Travelling costs Investments Feasibility study Working procedures Thematic consistency and eligible project Translation / interpreting ERDF, ESFor EAFRD programmes INTERREG IVCprojects (RUR@CT methodology)‏ ERDF programmeArticle 37-6bregulation 1083/2006

  12. Axis 5 – Measure 2“Pilot projects” • BeneficiariesLocal authorities, natural parks, associations, research and training institutes, consular chambers, firms • Types of actionsTransfer of experiences, knowledge & know-how, implementation of tools & services, common actions, methodological support for EU project application • Types of expendituresIngeneering, studies and expertiseMaterial investment within a pilot action • Eligibility conditionsThematic coherence with regional strategyMininum 2 partners involved from 2 member states • Funding conditionsMaximum public funding rate = 100%Maximum ERDF rate = 55%Minimum ERDF amount = 10 000 € EXPERIMENTATION

  13. Axis 5 – Measure 2“Pilot projects” Example of the «home automation » project of the Cities Community of Guéret • Development potential identified in the Home automation sector • Transferability study of a Swedish concept: rental and maintenance of home automation equipments • Partners: • Cities Community of Guéret (France)‏ • Hjälpmedel SAM Company (Sweden)‏ • Gävle Region (Sweden)‏ • Sandviken City (Sweden)‏ • Actions: Evaluation / analyse of the existing structure's services in Sweden Identification of partners for the implementation in Limousin Research of partners to lead the project on the territory of the C.C of Guéret

  14. Axis 5 – Measure 3“Networks” • BeneficiariesLocal authorities, natural parks, associations, research and training institutes, consular chambers, firms • Types of actionsParticipation of Limousin partners involved in existing cooperation networks, support to the creation of new networks (focusing on scientific & technological issues)‏ • Types of expendituresTravelling costs, personnel costs for management and coordination, logistical costs for organizing seminars, trainings and conferences, translation costs • Eligibility conditionsThematic coherence with regional strategyMininum 3 partners involved from 3 member states • Funding conditionsMaximum public funding rate = 100%MaximumERDF rate = 50%Minimum ERDF amount = 5 000 € EXCHANGES

  15. Axis 5 – Measure 3“Networks” Example of « amphibians » project • Decreasing population and diversity of amphibians • Link between emerging diseases & climate change • Natural Park of Perigord Limousin (France)‏ • University of Savoie (France)‏ • Veterinary school of Lyon (France)‏ • Amphibia Nature research group (Canada)‏ • Zoological society of Londdon (UK)‏ • Delta del Pô Park (Italy)‏ • European network about amphibians diseases • Exchanging knowledge (diagnosis, epidemiology)‏ • Implementing a surveillance network

  16. Thank you for your attention! Contacts: Sébastien Proeschel Délégation à la Coopération tel: 05 55 45 18 19 s-proeschel@cr-limousin.fr www.europeenlimousin.fr