350 likes | 433 Views
RETROCOMMISSIONING AIR HANDLING SYSTEMS In The College of Applied Science and Technology (CAST), Building 70 Critical Design Review Presentation. Project 05306. May 13th 2005. Team Members. Mechanical Engineers Erin Colquitt (Team Leader) Joe DiSanto (Chief Engineer)
E N D
RETROCOMMISSIONING AIR HANDLING SYSTEMS In The College of Applied Science and Technology (CAST), Building 70 Critical Design Review Presentation Project 05306 May 13th 2005
Team Members • Mechanical Engineers • Erin Colquitt (Team Leader) • Joe DiSanto (Chief Engineer) • Jason Bolton (HVAC Specialist) • Dan Esposito (HVAC Specialist) • Electrical Engineer • Jimmy Liang (Electrical Specialist)
Overview • Background • AHU System Components & Testing • Engineering Analysis • Retrofit Solutions
Background • Commissioning • Retrocommissioning • Reviews of existing system against design specifications • Extends lifetime of components • Analyzes efficiency for comparison • Minimize energy waste
Overview of SD I • Needs Assessment • Concept Development • Feasibility • Develop Initial Test Plan • Set Up Analysis
Project Goals - Senior Design 2 • Complete testing with AHU1 • Corrections of test checklists • Create Excel program for data analysis • Meet with sponsor to verify the checklists and performances of AHU1 • Develop retrofit solutions
Instrumentation • Digital Multimeter • Tachometer • Thermometer Probes • Digital Micromanometer • Wireless Laptop • Web Control
Testing • General AHU Test • Sensor Verification • Control Response • Supply/Return Fans • Heating/Cooling Coils • Economizer
Thermodynamic Analysis • Mass Balance • Energy Balance • Exergy Analysis • First and Second Law Efficiencies
Control Volume is around the AHU Mass flow in and out of CV Outside air Hot water Cold water Exhaust air Supply air Work into fans Steady State Air is an ideal gas Constant specific heats Incompressible flow of air No heat transfer out of CV Ignore potential and kinetic energy of air Assumptions
Exergy • Potential for energy use • Steady state exergy balance • Specific Flow Exergy (ef)
Economizer Analysis • Mass Balance • Energy Balance – check adiabatic assumption • 2nd Law Efficiency
Heating Coil • Energy Balance • 2nd Law Efficiency • Coil Effectiveness
Fan Performance • 1st Law Fan Efficiency • 2nd Law Efficiency
Findings • Reduced Damper Range • Dirty/Clogged Airflow Sensors • Reduced Static Pressure Set Point Maintained Occupant Comfort
Cost Savings • Assumptions • RIT receives a rate of electricity at 7.2cents/KWh • Two Air Handling Units are connected together • The new static pressure can be maintained for 50% of the year • Sample Calculation for reducing from 1.5 to 1 in WC Total Estimated Savings = $2,445.50/year
Retrofit Solutions • Fix Dampers to operate over full range • Routinely clean WebCtrl sensors • Reduce Duct Static Pressure To 1” WC