1 / 39

Campaign Assessment 9 Feb 12

Campaign Assessment 9 Feb 12. Baseline Campaign Assessment – (D+3, 9 Feb). DESIRED EFFECTS. END STATES. LINES OF OPERATION. G. Communication Integration. 1. Arcadia forces ceases all military actions. Arcadian forces are Withdrawn from Kuhistan and Free Mojave ; the MNF

Download Presentation

Campaign Assessment 9 Feb 12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Campaign Assessment 9 Feb 12

  2. Baseline Campaign Assessment – (D+3, 9 Feb) DESIRED EFFECTS END STATES LINES OF OPERATION G Communication Integration 1. Arcadia forces ceases all military actions. Arcadian forces are Withdrawn from Kuhistan and Free Mojave; the MNF Has transitioned Security operations To Royal Kuhistan Armed Forces and Free Mojave National Army and/ Or a UN authorized force; and restorestability & security in Pacifica Region. A/G 2. Arcadia forces do not occupy Kuhistan territory. A 3. Arcadia forces do not occupy Free Mojave territory. Peace Enforcement A/R 4. Sonora does not support Arcadia Military operations. R 5. Cathay does not support Arcadia Military operations. N Transition Operations 6. Regional Partners support MNF operations. 7. Humanitarian Assistance operations in Pacifica are effective. Stabilization & HA 8. Kuhistan RAF is ready for transfer of responsibility. 9. Free Mojave National Army or UN Authorized Force is ready for transfer of responsibility. On Plan Partially On Plan Off Plan Not Assessed

  3. Campaign End State Status G A/G A A/R R N On Plan Partially On Plan Off Plan Not Assessed

  4. Findings & Recommendations FINDINGS: RISKS: • Diplomatic actions have not been successful in having Arcadia comply with UNSCR 2000. • MNF IO actions are not effective at this stage • Based on the Constraints and Restraints, what are the risks?. • Based on the opportunities, what are the risks involved. • Is there a risk associated with JPCON leaving the AO? • ARC broadening regional conflict OPPORTUNITIES: RECOMMENDATIONS: • Identify opportunities across DIME as it affects the operational environment. • Is there an opportunity with JPCON? • Recommendations based on consultations with JPG Planners, C35 and C5 (Currents Ops, Future Ops, and Future Plans. • Transition to Phase 2 early

  5. ASSESSMENT DRILL DOWN

  6. EFFECT #1 On Plan Partially On Plan Off Plan Not Assessed

  7. EFFECT #2 On Plan Partially On Plan Off Plan Not Assessed

  8. EFFECT #3 On Plan Partially On Plan Off Plan Not Assessed

  9. EFFECT #4 On Plan Partially On Plan Off Plan Not Assessed

  10. EFFECT #5 On Plan Partially On Plan Off Plan Not Assessed

  11. EFFECT #6 On Plan Partially On Plan Off Plan Not Assessed

  12. EFFECT #7 On Plan Partially On Plan Off Plan Not Assessed

  13. EFFECT #8 On Plan Partially On Plan Off Plan Not Assessed

  14. EFFECT #9 On Plan Partially On Plan Off Plan Not Assessed

  15. Lines of Operations & Key Tasks

  16. PH 1 Component Key Tasks PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CNAVFOR/CFACC T: Secure air and sea ports of debarkation P: Posture MNF forces CNAVFOR T: Establish maritime exclusion zone P: Ensure MNF has freedom of maneuver in AO CFACC T: Establish air exclusion zone P: Ensure MNF has freedom of maneuver in AO CJSOTF T: Advance Force Operations P: Shape the battle space Reserve KUH 84th Inf Bde On Plan Partially On Plan Off Plan Not Assessed

  17. CJSOTF Key Tasks (PH 2) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC NSWTG T1: Conduct limited SR (TGO), DA, and limited UW P1: Degrade ARC IADS, C4ISR, and logistics P2: Motivate ARC forces to depart KUH SOTF KUH T1: Conduct limited SR (TGO), DA, and limited UW P1: Degrade ARC IADS, C4ISR, and logistics P2: Motivate ARC forces to depart KUH SOTF FM T1: Conduct limited SR (TGO), DA, and limited UW P1: Degrade ARC IADS, C4ISR, and logistics P2: Motivate ARC forces to depart FM Supporting Efforts CJSOAD CPOTF On Plan Partially On Plan Off Plan Not Assessed

  18. CJSOTF Key Tasks (PH 3) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC NSWTG T1: Provide support to seizure of Kelowna via SR, DA, and UW P1: Degrade ARC IADS, C4ISR, and logistics P2: Enable conventional forces clearing in North KUH SOTF KUH T1: Conduct SR (TGO), DA, and limited UW P1: Degrade ARC IADS, C4ISR, and logistics P2: Enable conventional forces clearing in Central KUH SOTF FM T1: Conduct limited SR (TGO), DA, and limited UW P1: Degrade ARC IADS, C4ISR, and logistics P2: Enable conventional forces clearing in FM Supporting Efforts CJSOAD CPOTF On Plan Partially On Plan Off Plan Not Assessed

  19. CJSOTF Key Tasks (PH 4) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC NSWTG T1: Conduct counter ARC SOF operations P1: Defeat Arcadian SOF in KUH and FM T2: Enable DDR of UW forces P2: Support transition of UW forces to pre-conflict roles SOTF KUH T1: Conduct counter ARC SOF operations P1: Defeat Arcadian SOF in KUH T2: Enable DDR of UW forces P2: Support transition of UW forces to pre-conflict roles SOTF FM T1: Conduct counter ARC SOF operations P1: Defeat Arcadian SOF in FM T2: Enable DDR of UW forces P2: Support transition of UW forces to pre-conflict roles Supporting Efforts: CJSOAD CPOTF On Plan Partially On Plan Off Plan Not Assessed

  20. CFACC Key Tasks (PH 2) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC MAIN EFFORT T1: Gain and Maintain Localized Air Superiority (AS) P1: Enable MNF freedom of operations T2: Interdict ARC LOCs P2: Degrade ARC fielded forces resupply; isolate T3: Shape force entry operations P3: Enable friendly ground force offensive operations SUPPORTING EFFORT: T1: Enforce AEZ / Support MEZ enforcement P1: Compel ARC withdrawal / isolate ARC T2: Conduct ISR P2: Find, Fix, Track and Target ARC forces T3: Support SC and IO P3: Compel ARC withdrawal Supporting Efforts: CJSOAD CPOTF AI Air Refueling AEZ On Plan Partially On Plan Off Plan Not Assessed

  21. CFACC Key Tasks (PH 3) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC MAIN EFFORT T1: Expand Air Superiority (AS) over KUH and FM P1: Enable MNF freedom of operations T2: Destroy ARC fielded forces P2: Attrite ARC fielded forces and force withdrawal SUPPORTING EFFORT: T1: Enforce AEZ / Support MEZ enforcement P1: Compel ARC withdrawal / isolate ARC T2: Conduct ISR P2: Find, Fix, Track and Target ARC forces T3: Intra-Theater airlift P3: Maintain resupply of MNF forces .. Supporting Efforts: DCA C2/ISR AI Air Refueling AEZ On Plan Partially On Plan Off Plan Not Assessed

  22. CFACC Key Tasks (PH 4) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC MAIN EFFORT T1: Maintain Air Superiority (AS) over KUH and FM P1: Enable MNF freedom of operations T2: ISR operations to monitor ARC forces P2: Ensure ARC forces withdrawal from KUH T3: Enforce AEZ P3: Deter ARC aggression SUPPORTING EFFORT: T1: Support MEZ enforcement P1: Deter ARC aggression T2: Intra-Theater Airlift P2: Sustain MNF forces / Support HA.. Supporting Efforts: DCA C2/ISR AI Air Refueling AEZ On Plan Partially On Plan Off Plan Not Assessed

  23. CNAVFOR Key Tasks (PH 2) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC MAIN EFFORT Support aggressive IO plan Enforce MEZ Mine Sweeping Operations Conduct Port Seizure Conduct surface, anti-submarine operations RADC duties Conduct strategic strikes Cut off ARC lines of communications Seamless MNF partner integration Provide Logistics support to CNAVFOR forces On Plan Partially On Plan Off Plan Not Assessed

  24. CNAVFOR Key Tasks (PH 3) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC MAIN EFFORT Support aggressive IO plan Enforce MEZ Conduct amphibious assault Conduct offensive operations Conduct MIO Conduct/Support HA operations Seamless MNF partner integration On Plan Partially On Plan Off Plan Not Assessed

  25. CNAVFOR Key Tasks (PH 4) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC MAIN EFFORT Maintain security in AO Facilitate transition of KUH back to legitimate government Conduct/Support HA operations. On Plan Partially On Plan Off Plan Not Assessed

  26. CMARFOR Key Tasks (PH 2) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Begin collection on NAI Fires: Support MNF/CFACC ATO generations IO: Support MNF Strat Comm messaging LOG: Establish FOB Spokane ICW KUH; Provide CSS FP: Continue AD/CAP coverage of SPOD & FOB Maneuver: RTMC Division USMC RCT-e ROK RLT-7 (CNAVFOR) MAG-36 CLR-3 On Plan Partially On Plan Off Plan Not Assessed

  27. CMARFOR Key Tasks (PH 3 – Stage A) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Continue collection on NAI Fires: Shape enemy forces in CMARFOR AO IO: Target enemy commanders with withdrawal options LOG:Provide CSS from CSSA Spokane FP: Continue AD/CAP coverage of SPOD & FOB Maneuver: RTMC Division USMC RCT-3 ROK RLT-7 MAG-36 (ME) CLR-3 On Plan Partially On Plan Off Plan Not Assessed

  28. CMARFOR Key Tasks (PH 3 – Stage B) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Collection on NAI Fires: Shape enemy forces vic CMF Obj 3. IO: Continue to target enemy commanders options LOG:Provide CSS from CSSA Spokane FP: Continue AD/CAP coverage of SPOD & FOB Maneuver: RTMC Division USMC RCT-3 (ME) ROK RLT-7 MAG-36 CLR-3 On Plan Partially On Plan Off Plan Not Assessed

  29. CMARFOR Key Tasks (PH 3 – Stage C) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Collection on NAI Fires: Provide DS fires to ME, Target (C2, BAGs, Armor) IO: Confirm MNF intentions to restore KUH borders LOG:Provide CSS from CSSA Spokane FP: Continue AD/CAP coverage of SPOD & FOB Maneuver: RTMC Division (ME) USMC RCT-3 ROK RLT-7 MAG-36 CLR-3 On Plan Partially On Plan Off Plan Not Assessed

  30. CMARFOR Key Tasks (PH 4) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Collection on ARC Ph IV actions/intentions Fires: Provide on-call CAS/IDF as required IO: Confirm MNF intentions to restore KUH borders LOG:Provide CSS from CSSA Spokane FP: Continue AD/CAP coverage of SPOD & FOB Maneuver: RTMC Division (ME) USMC RCT-3 ROK RLT-7 MAG-36 CLR-3 On Plan Partially On Plan Off Plan Not Assessed

  31. CARFOR Key Tasks (PH 2) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Conduct ISR to detect ADA, TBM Fires: Destroy enemy ADA systems and ARC fire support FP: Protect units during move to Tactical AAs SUS: Occupy LSPs to support CARFOR attack in zone IO: Continue efforts to encourage ARC forces to W/D CARFOR HQ (ME) T1: Conduct FP vic AO T2: Conduct CMO Task Force West (SE) T1: Conduct FP vic Reno T2: Strategic strikes on TBM, SAM, C2 sites, airfields Task Force East (SE) T1: Conduct FP vic Boise On Plan Partially On Plan Off Plan Not Assessed

  32. CARFOR Key Tasks (PH 3A) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Conduct ISR to id strategic & tactical EN assets Fires: Defeat enemy fire support FP: Patrol MSRs, insure FOM SUS: Establish LOCs and LSPs along MSR in AOR IO: Continue efforts to encourage ARC forces to W/D CARFOR HQ (SE) T1: Conduct PEO to include forcible entry operations Task Force West (ME) T1: Defeat ARC forces vic Obj 1 T2: Fix ARC forces vic Obj 2 Task Force East (SE) T1: Defeat ARC forces vic Obj 3 T2: Fix ARC forces vic Obj 4 On Plan Partially On Plan Off Plan Not Assessed

  33. CARFOR Key Tasks (PH 3B) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Identify EN disposition, detect movement of reserve Fires: Isolate OBJs 2, 4; fix ARC reserve Bde FP: MMS, AS, IR, L&O, PIO SUS: Extend LOCs; establish LSA to spt offensive ops IO: CARFOR HQ (SE) T1: Conduct PEO Task Force West (ME) T1: Block ARC reserve forces north of OBJ 1 T2: Defeat ARC forces at OBJ 2 Task Force East (SE) T1: Block ARC reserve forces northeast of OBJ 3 T2: Defeat ARC forces at OBJ 4 On Plan Partially On Plan Off Plan Not Assessed

  34. CARFOR Key Tasks (PH 3C) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Detect movement of reserve & IDPs Fires: Defeat EN fire support; Disrupt ARC attacks FP: MMS, AS, IR, L&O, PIO SUS: Provide CSS IO: Continue IO to encourage IDPs to remain in KUH CARFOR HQ (SE) T1: Conduct PEO Task Force West (ME) T1: Clear KUH territory to ARC border T2: O/O Defend KUH border Task Force East (SE) T1: Clear KUH territory to ARC border T2: O/O Defend KUH border On Plan Partially On Plan Off Plan Not Assessed

  35. CARFOR Key Tasks (PH 4) PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CONOPS: Intel: Identify remaining EN in KUH; monitor IDP movements Fires: Establish new FPOL along border FP: IR, L&O, MMS, AS, PIO SUS: Sustain the force; transition LOG to host nation IO: Increase support to Gov authorities in KUH and FM CARFOR HQ (ME) T1: Establishment of policy for transfer of authority Task Force West (SE) T1: Maintain presence in AO Task Force East (SE) T1: Maintain presence in AO On Plan Partially On Plan Off Plan Not Assessed

  36. Back-ups

  37. DECISIVE AND SWIFT COMBAT OPS TIMELINE • This OP is designed to swiftly and decisively compel Arcadian forces to withdraw from KUH and FM using a short and aggressive IO campaign, followed by quick and effective application of overwhelming force. It will include the establishment of AEZ/MEZ, Strategic strikes in Arcadia to degrade Arcadian power projection, and cut off sustainment capabilities. Thereafter execute 3-pronged entry ops into the battlespace, rapidly defeating Arcadian combat power, choking off Arcadian LOCs and driving them out of KUH and FM. Once Arcadian forces are driven out of KUH and FM, the focus will be on security and stability, civil-military operations and transition operations. SECURE APOD / SPOD SECURE APOD / SPOD ESTB MEZ / AEZ ESTB MEZ / AEZ ENFORCE AEZ / MEZ ENFORCE AEZ / MEZ MAINTAIN SECUIRTY IN AO MAINTAIN SECUIRTY IN AO 3 4 5 1 2 OFFENSIVE OPS OFFENSIVE OPS RE-ESTB INT’L BORDER RE-ESTB INT’L BORDER FORCIBLE ENTRY INTO AO FORCIBLE ENTRY INTO AO STRATEGIC STRIKE STRATEGIC STRIKE DEPLOY MNF DEPLOY MNF CONDUCT ISR CONDUCT ISR ESTB POLICY FOR TRANSFER OF AUTHORITY ESTB POLICY FOR TRANSFER OF AUTHORITY COORD & CONDUCT CMO COORD & CONDUCT CMO CUT ARC LOC CUT ARC LOC COUNTER SF / PSYOPS COUNTER SF / PSYOPS CONDUCT IO BY PHASES CONDUCT IO BY PHASES DP 1. Conduct Strategic Strike (transit to Phase 2 Earlier) Conditions. a. ARC kinetic strikes disrupt MNF flow b. Permission from HHQ c. Sufficient assets in theatre DP 2. To continue Kinetic Ops / Transit to Phase 2 Conditions. a. IO not effective b. Diplomatic actions not successful c. MNF postured, ready for Phase 2 DP 3. Transit to Phase 3 Conditions. a. MNF ready to escalate offensive ops. b. ARC Combat Power Projection and sustainment capabilities degraded. DP 4. Transit to Phase 4 Conditions. a. ARC no longer in KUH and FM DP 5. Transit to Phase 5 Conditions. a. Security in AO is maintained b. CMO and IO is effective c. KUH and FM Forces and / or UN Forces ready to take over

  38. JPCON Key (CTF/MNF) Tasks PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC CTF HQ: Name of task Name of task CARFOR: Name of task Name of task CNAVFOR: Name of task Name of task CFACC: Name of task Name of task CJSOTF: Name of task On Plan Partially On Plan Off Plan Not Assessed

  39. Communication Integration (IO) Key Tasks PH 0 Crisis PH 1 Deter PH 2 Seize The Initiative PH 3 Dominate PH 4 Stabilize D-DAY MAINTAIN SECUIRTY IN AO SECURE APOD / SPOD ESTB MEZ / AEZ ENFORCE AEZ / MEZ OFFENSIVE OPS ESTB POLICY FOR TRANSFER OF AUTHORITY FORCIBLE ENTRY INTO AO RE-ESTB INT’L BORDER STRATEGIC STRIKE DEPLOY MNF CONDUCT ISR COORD & CONDUCT CMO COUNTER SF / PSYOPS CUT ARC LOC

More Related