Preliminary Design ReviewWeek 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008
Previous Week’s Action Items • Acquire Parts and Materials • Acquired All Ordered Materials • CAD Redesign • Continue Working with GPS • Begin Programming and Interface with GPS • Began Programming Logic • Digital Compass • Continue Testing and Improve Accuracy • Second GPS Test
Previous Week Action Items and Status CURRENT STATUS: On Schedule, No Showstoppers
Acquired Parts • 12” x 24” x 3/8” Gray PVC • 12” x 24” x 3/16” Clear PVC • 15 lb/in Springs • 57 lb-oz Servo Motor • Digital Compass • Bumper – Maximum deflection of 0.000406”
More Parts to Order • 6” Long 3/16” Dia. Precision Ground Rod • 6 Brass Bushings • C-Clips • Set Screws • L-Brackets • 2 Hinges • 4 Colored Light Bulbs • 4 Light Bulb Mounts
Second Test GPS for Accuracy Distance between degrees of latitude ~ 69 miles Distance between degrees of longitude ~ 50 miles
Next Week’s Action Items • Order All Necessary Parts • McMaster-Carr • Complete Machining of Platform Base and Fit to Chassis • Continue Working on Program • Interfacing with Peripheral Equipment • Search Algorithm