P802.11ad Report to EC on Conditional Approval to forward draft to RevCom. Date: 2012-08-16. Authors:. Introduction. The IEEE 802 Executive Committee (EC) granted conditional approval to 802.11 to send IEEE P802.11ad Draft 9.0 to Revcom on 2012-07-20.

mili
Download Presentation

Date: 2012-08-16

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P802.11ad Report to EC on Conditional Approval to forward draft to RevCom Date: 2012-08-16 Authors: Eldad Perahia, Intel Corporation

  2. Introduction • The IEEE 802 Executive Committee (EC) granted conditional approval to 802.11 to send IEEE P802.11ad Draft 9.0 to Revcomon 2012-07-20. • P802.11ad D9.0 has completed its fifth recirculation ballot, achieving 98% approval and meeting the terms of the conditional approval. • This presentation is the report to the IEEE 802 executive committee in support of completion of the requirements for conditional approval to send IEEE P802.11ad Draft 9.0 to Revcom. Eldad Perahia, Intel Corporation

  3. Sponsor Ballot Results – P802.11ad Eldad Perahia, Intel Corporation

  4. 802.11 WG Sponsor Ballot Comments – P802.11ad Eldad Perahia, Intel Corporation

  5. Unsatisfied Technical comments by commenter *Assumed unsatisfied, no response to emails to commenter Eldad Perahia, Intel Corporation

  6. Unsatisfied Editorial comments by commenter Eldad Perahia, Intel Corporation

  7. Unsatisfied comments • The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: • Double click on the icon to the right to open this. • A copy of this same data presented using MyBallot access database report format is attached. • Double click on the icon to the right to open this. Eldad Perahia, Intel Corporation

  8. Mandatory Coordination Eldad Perahia, Intel Corporation

  9. TGad Timeline * The revised RevCom submission will be submitted 25 days prior to the SB meeting, according to RevCom policy section 6 Eldad Perahia, Intel Corporation