Rolls Royce High Pressure Water Jet Cleaning System Final Presentation

Rolls Royce High Pressure Water Jet Cleaning System Final Presentation. Design Group: Wei-Yuan Chu Adrian Conrad Thomas Hylton Scott Jean Nicholas Metzger. IUPUI Faculty Advisor: Dr. Jie Chen Rolls-Royce Advisor: Timothy Fuesting. Design Process. Establish a Need

milica
Download Presentation

Rolls Royce High Pressure Water Jet Cleaning System Final Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rolls Royce High Pressure Water Jet Cleaning System Final Presentation Design Group: Wei-Yuan Chu Adrian Conrad Thomas Hylton Scott Jean Nicholas Metzger IUPUI Faculty Advisor: Dr. Jie Chen Rolls-Royce Advisor: Timothy Fuesting

  2. Design Process Establish a Need Identify the Customer Determine Customer Requirements Develop Engineering Specifications Concept Development & Evaluation Design Product Evaluate Product to Specifications Manufacture and Testing Product Release

  3. Airfoil

  4. Airfoil Ends

  5. Dry Box for Blasting

  6. Who is Our Customer ? • Rolls-Royce Engineering Timothy Fuesting Mary Gambone • Rolls-Royce dry box operator assemble and safely use fixture to clean airfoils • Rolls-Royce maintenance / tool & dye maintain / repair system • Manufacturer simple to make parts • Environment environmentally safe / recyclable

  7. What Does the Customer Want ?(Initial Survey) • Operator Safety no possible contact with skin • Works as Required removes debris / high pressure (≈4000 psi) • Fits in the space occupied by former system • Easy to Use little operator training required • Easy to Assemble • Easy to Maintain • Simple to Manufacture • No Harm to the Environment recyclable

  8. Engineering Specifications Provide high pressure water through the handheld spray nozzle Provide high pressure water through the fixture Fixture Operating Height Under 8” Fixture must be Compact Fixture must have High Backpressure Tolerance Multiple Water Flow Directions Number of Adjustable Features Number of days between maintenance should be high Corrosion Resistance

  9. Conceptual Design

  10. Design for Airfoil Variation • Fixture Design allows for securing the airfoil in either inner or outer rod configuration. • Outer Configuration is required for airfoils with obstructed interior passages.

  11. Off the Shelf Products • Swiveling quick disconnects provide rotation of the fixture, as well as easy removal.

  12. Video File of Fixture Model

  13. Existing Hose and Water Gun Water In Fixture Water Out Hydraulic Routing

  14. Connections A. Base plate B. Quick disconnection parts and rubber pads C. Slider arbor D. Socket rods connect large contact and small contact

  15. Connections • E. • Quick • disconnections and • contacts • F. • Rubber and • contacts • G. • Fixed arbor

  16. Connections H. Distance controller I. Arbor top and arbor J. Screws connect arbor and plate

  17. Product Evaluation Engineering Targets tested through various methods of analysis. Each of the engineering targets represented in numerical values. Each requirement must meet the customers’ standards.

  18. Fixture/Spray Gun Pressure • Utilized the modified Bernoulli Equation Assumptions: Steady Flow, Incompressible, No heat transfer • Results: • Fixture inlet pressure: 3,582 psi • Spray Gun Outlet Pressure: 3,013 psi

  19. Corrosion Resistance Using the maximum values listed at AZOM for 304 stainless steel of 20% Cr, 0% Mo, and 10% N to calculate the PRE (Pitting Resistance Equivalent) Corrosion occurs with the breakdown of the protective surface film on the steel commonly caused from exposure to sulfide and chloride ions Quenching, adding Molybdenum, and Nitrogen to the metal helps prevent corrosion

  20. Cost Analysis • Consisting of mostly stainless steel components and high pressure connections the design consisted of: • 35 Components • Rolls Royce had most components in house causing a reduced retail price • Approximate Non reduced Total Cost: $ 1,918.44

  21. Fixture Operating Height 4.5” Fixture’s operating height: 4.5” Designed to function under comfortable operating conditions within the parameters of the dry box.

  22. Stress Tolerance • Analysis using ANSYS Workbench • Worst Case Scenario • Maximum Pressure • Uniformly Distributed Force • (4000 psi = 27.579 Mpa) • Perpendicular to Large Contact Faces

  23. Meshing Technique • Coarse Mesh • High Stress Areas • Refined Locations: • Large Contact Holes • Arbor Base Edges

  24. Analyzing ANSYS Results • Analysis to look at • Total Deformation • Tensile Stresses • Locate Problem Areas • Max Stress Locations • Less than Stainless Steel Yield Strength of 515 MPa.

  25. Max Stress Locations Outer Rod Assembly Inner Rod Assembly Max Tensile Stress: 407 MPa Max Tensile Stress: 312 MPa

  26. Total Deformation Outer Rod Assembly Inner Rod Assembly Max Deformation: .16 mm Max Deformation: .23 mm

  27. Results

  28. Conclusions & Recommendations • Fixture is designed to Engineering Requirements • Replace Threaded Rods with Rack & Pawl for use in Production • Base with interchangeable posts for blasting ends • Flange Bearing Style Base

  29. Questions