1 / 8

Cameco Cigar Lake High Pressure Jet Water Heat Dissipation System Design

Cameco Cigar Lake High Pressure Jet Water Heat Dissipation System Design. Preliminary Design Presentation Arthur Cradock Jason Iverson Mykola Gauk. Background . Cigar Lake – Largest undeveloped uranium ore body in the world.

trina
Download Presentation

Cameco Cigar Lake High Pressure Jet Water Heat Dissipation System Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cameco Cigar LakeHigh Pressure Jet Water Heat Dissipation System Design Preliminary Design Presentation Arthur Cradock Jason Iverson MykolaGauk

  2. Background • Cigar Lake – Largest undeveloped uranium ore body in the world. • Ground is very unstable and must be frozen prior to ore extraction. • Ore is mined using high pressure water pumped by four 800hp positive displacement pumps. • The mine is currently underwater.

  3. Problem Description • Water temperature exceeds pump operating conditions (Tmax = 30oC) • Four high pressure pumps operate continuously throughout mining process in either jetting or standby mode • Max water pressure of 100MPa • When not jetting, water recirculates • Automated process

  4. System Schematic

  5. Objectives • Evaluate the current system and create an engineering model • Evaluate possible solutions for removing excess heat to remain within operating temperatures • Detailed analysis on final design solution • Deliverables include final drawings, parts list and cost analysis

  6. Status • Met with client to discuss scope and constraints • Received information package from client including drawings and previous test report • Developed written scope of work for client • Developed schedule of events • Developed system schematic • Currently developing engineering model • Currently awaiting on vendor feedback

  7. Schedule

  8. Questions?