10 likes | 118 Views
SC19 report to SC18. SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers. We have 15 standards in revision or newly created .
E N D
SC19 report to SC18 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers. We have 15 standards in revision or newly created. • 11D1 – Packers and Bridge Plugs – first ballot in Q1, 2014 – hope to publish in Q2/Q3 • 14A – Subsurface Safety Valve – first ballot closes 12 Feb. – hope to publish in Q2/Q3 • 14B – SSSV installation – ballot in Q1, 2014 – hope to publish in Q2/Q3 • 19S – Sand Screens – adopt-back of ISO 17824 – initial ballot in Q1, 2015 • 19L – Liner Hangers – in process – potential publication in 2015 • 19A – Completion Accessories – adopt-back of ISO 14998 - SR3 to revise just submitted • 19B – Peforators – Revising by section • RP67 – Explosive Safety – revising entire document (just beginning) • 19TT1 –Downhole Well Test Tools – approximately 85% complete – ballot in Q2, 2014 • Gas Lift Handbook – just beginning – replaces several RPs – hope to publish in 2016 • 19G1 – Side-pocket mandrels – SR3 to revise just submitted • 19G2 – Flow control devices – first ballot in Q3, 2014 • 19G3 – Running, pulling, & K/O tools – Color coding complete. Minor changes needed. • 19G5 – Operations & Maintenance of GL - SR3 to revise just submitted • 19G6 – Design of installations using IPO valves – 90% complete – initial ballot in Q1, 2014 • API Monogram program, Q1 well understood and utilized with the SC documents.