80 likes | 491 Views
“ PAL” CASING PLUNGERS. PAAL, LLC 9500 CEDAR LAKE AVENUE OKLAHOMA CITY, OK 73114 405-475-6334. EXPECTED PERFORMANCE GAS WELLS. CONSERVATION OF ENERGY EFFICIENT FLUID REMOVAL INCREASED GAS PRODUCTION REDUCED OPERATING PRESSURE REALLOCATION OF ASSETS. WELL SELECTION CRITERIA.
E N D
“ PAL” CASING PLUNGERS PAAL, LLC 9500 CEDAR LAKE AVENUE OKLAHOMA CITY, OK 73114 405-475-6334
EXPECTED PERFORMANCEGAS WELLS • CONSERVATION OF ENERGY • EFFICIENT FLUID REMOVAL • INCREASED GAS PRODUCTION • REDUCED OPERATING PRESSURE • REALLOCATION OF ASSETS
WELL SELECTION CRITERIA • EVIDENCE OF FLUID LOADING • CURRENT METHOD LESS THAN OPTIMAL • RESERVOIR CONDITIONS FAVORABLE • WELLBORE CONDITIONS FAVORABLE • PERFORATIONS FAVORABLE • CLEAN UNIFORM CASING • SURFACE EQUIPMENT
WELL PREPARATION • REMOVE RODS &/OR TUBING • CONVERT WELLHEAD TO 8rd thd. UP • INSTALL FULL PORT VALVE ASSEMBLY • CLEAN CASING ID WITH SCRAPER • SET COLLAR STOP ABOVE TOP PERF • SWAB FLUID DOWN • DROP “PAL” PLUNGER
PRODUCTION CHARACTERISTICS • GOR > 15,000 cu ft/bbl @ 6000-8000ft • BHP > 50 PSIG DIFFERENTIAL TO LINE • SURFACE EQUIPMENT – HANDLE SLUGS • TYPICAL WELL BORE FLUIDS • DEPTHS LESS THAN 9000 ft
TYPICAL COSTS • LAY DOWN RODS/TUBING • WELL HEAD CONVERSION • CASING PREPARATION • “PAL” SYSTEM--$12,500—$15,500 • SALVAGE VALUE OF EQUIPMENT