Aquila, Inc WestPlains Energy – Colorado

Aquila, Inc WestPlains Energy – Colorado. Alan Myers, Manager Transmission Services. Aquila Planning Procedures. Produce a long-range planning study every three years – at least 10 years into the future Assess long-range plan for near term budget each spring

mindy
Download Presentation

Aquila, Inc WestPlains Energy – Colorado

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aquila, IncWestPlains Energy – Colorado Alan Myers, Manager Transmission Services

  2. Aquila Planning Procedures • Produce a long-range planning study every three years – at least 10 years into the future • Assess long-range plan for near term budget each spring • Participate in joint studies with neighboring utilities on issues of mutual interest • Participate in CCPG regional planning efforts

  3. Near Term System Needs • Load growth in Pueblo • Load growth in Canon City • Load growth in Cripple Creek/Victor area

  4. Pueblo Area Plans • General approach is to move load from 69 kV system to 115 kV system • Planning three new 115 kV substations in Pueblo area in the next 3-5 years • New substations will pick up new load and shift some existing load from 69 kV to 115 kV • Also plan to add approximately 20 new miles of 115 kV transmission line in the area

  5. Canon City and Cripple Creek/Victor Areas Plans • Plan to build a new 115 kV line up the Cripple Creek area and install a 115/69 kV Substation in the next 2-5 years • Improvement will support load growth in both areas